Войти:
Оценок - 0, средний балл: 0 ( )

Инструкция по эксплуатации HP, модель HP 4400 Dual Controller Enterprise Virtual Array w/Embedded Switch

Производитель: HP
Размер: 283.54 kb
Название файла:
Язык инструкции:en
Перейти к скачиванию



К этому устройству также есть другие инструкции:

Фрагмент инструкции





= Unit identification. Push switch to illuminate solid blue; push
again to turn off. The UID mimics the status of the UID at the rear of
the enclosure.
Installing the front UID board
1.
Insert the front UID board into the black housing.
Removing the front UID board
2.
Set the board and housing in place, over the tab on the enclosure.
3.
Secure the housing with a T-10 screw.
1.
Power down the enclosure.
4.
Slide the enclosure into the rack, and tighten the thumbscrews to
a.
For the MSA6X/7X: Power down any attached servers (see
secure the enclosure faceplate to the rack.
your server documentation). Press the On/Standby button on
the disk enclosure, and wait for the system power LED to go
5.
Attach the left and right front bezel ears.
from green to amber. Disconnect the power cords.
6.
Reconnect the power cords.
b.
For the EVA: Power down the array (controller enclosure and
7.
Press the Power On/Standby button on the power UID bezel (located
disk enclosures) with HP Command View EVA, or on the
at rear of enclosure) and hold it down long enough to power up
EVA4400 only, the Web-based operator control panel
the enclosure.
(WOCP). Powering down the controller enclosure also removes
power from the disk enclosures. Disconnect the power cords.
8.
For the EVA only: Power up any other disk enclosures attached to
the array by pressing their Power On/Standby button on the power
2.
The enclosure should not need to be removed from the rack. Check
UID bezel. After power has been applied to all disk enclosures,
that there is enough slack in the cabling to pull it out of the rack
then apply power on the controller enclosure using the power button
several inches to access the front UID.
on the power UID bezel.
3.
Pull off the left and right bezel ears (1, Figure 2), loosen the front
panel thumbscrews (2) that secure the enclosure faceplate to the
front of the rack, and pull it out several inches from the rack.
Verifying proper operation
NOTE:
After powering up, wait one minute for the system to check
component status.
1
2
Verify the status LEDs for proper illumination as described in the Verifying
component failure se
ction.
Figure 2 Removing disk enclosure bezel ears and thumbscrews
4.
Remove the T-10 screw securing the black housing to the enclosure
(1, Figure 3).
1
2
15824
Figure 3 Removing the front UID board
5.
Lift up on the black housing to clear it from the enclosure (2) and
then lift the housing and board away from the enclosure.
6.
Remove the board from the housing.
Page 2


...

Эта инструкция также подходит к моделям:
Устройства обработки данных - HP 4400 Dual Controller Enterprise Virtual Array (283.54 kb)
Устройства обработки данных - HP EVA6400 Array (283.54 kb)
Устройства обработки данных - HP EVA6400 for Storage Centric Rack (283.54 kb)
Устройства обработки данных - HP EVA8400 Array (283.54 kb)

Напишите ваш отзыв об устройстве



Текст отзыва
Ваше имя:
Введите две цифры:
capcha





Категории