Войти:
Оценок - 3, средний балл: 4.7 ( )

Инструкция по эксплуатации Impex, модель CG 1400

Производитель: Impex
Размер: 2.86 mb
Название файла: b2acecb9-6d8c-4320-8087-740e3666d1c0.pdf
Язык инструкции:en
Перейти к скачиванию



Фрагмент инструкции


.” Washers (#53), and one M10 Aircraft Nut (#55). E.) Draw the Cable around the Pulley then upward through the open slot on the Front Upper Vertical Frame (#5) to an open bracket. Repeat Procedure C above to install a Pulley. F.) Draw the Cable around the Pulley then pull downward. Attach the Cable to the Double Floating Pulley Bracket (#18). Repeat the Procedure C to install another Pulley. Let the Bracket hanging for now. G.)Draw the Cable around the Pulley then pull upward to the last open bracket on the back of the Upper Frame. Repeat Procedure C to install a Pulley. H.) Pull the Cable downward to the Weight Holder (#2). Secure the Cable to the Holder with one M10 x 1” Allen Bolt (#75), two . .” Washers (#53), and one M10 Aircraft Nut (#55). 14 DIAGRAM 8 15 STEP 9 (See Cable Loop Diagram & Diagram 9) A.) Attach one end of the 116” Butterfly Cable (#29) to the Hook on the Right Butterfly Arm (#14). Pull the Cable to the Butterfly Pulley Bracket (#10). Attach a Pulley (#28) to the Bracket. Secure it with one M10 x 1 .” Allen Bolt (#45), two . .” Washers (#53), and one M10 Aircraft Nut (#55). B.) Draw the Cable around the Pulley then downward. Attach a Pulley to the Cable. Then attach the Pulley to an Angled Floating Pulley Bracket (#19). Secure the Pulley to the Bracket with one M10 x 1 .” Allen Bolt (#45), two . .” Washers (#53), and one M10 Aircraft Nut (#55). Let the Bracket hanging for now. C.) Draw the Cable underneath and around the Pulley then upward to the open Butterfly Pulley Bracket (#10) on the other side. Repeat Step A & B above to install the Cable. DIAGRAM 9 16 STEP 10 (See Cable Loop Diagram & Diagram 10) A.) Insert the 151.6” Lower Cable (#30) through the opening on bottom of the Leg Developer (#11). Attach a Pulley (#28) to the opening. Secure it with one M10 x 2 3/8” Allen Bolt (#46), two . 7/8” Pulley Bushings (#51), and one M10 Aircraft Nut (#55). B.) Draw the Cable underneath the Pulley and through the opening on the bottom of the Main Seat Support to the open bracket on the Main Base Frame (#6). C.) Attach a Pulley to the bracket. Secure it with one M10 x 1 .” Allen Bolt (#45), two . .” Washers (#53), and one M10 Aircraft Nut (#55). D.) Pull the Cable towards the back of the machine through the bottom opening on the Front Lower Vertical Beam (#82) to the open bracket on the Main Base Frame (#6). Repeat the Procedure C to install a Pulley. E.) Draw the Cable underneath the Pulley then upward to the Angled Floating Pulley Bracket (#19) previously installed. Repeat the Procedure C to install a Pulley to the open bracket. F.) Draw the Cable around the Pulley then downward to the last open bracket on the Main Base Frame. Repeat the Procedure C to install a Pulley. G.) Draw the Cable underneath the Pulley then pull upward to the Double Floating Pulley Bracket (#18) previously installed. Connect the Cable to the Short Chain (#58) with a C-clip (#57). Then connect the Chain to the Bracket with a M10 x 1” Allen Bolt (#75), two . .” Washers (#53) and one M10 Aircraft Nut (#55). H.) Adjust the length of the Short Chain to adjust the tension of the Cables. If there is too much sag in the cables, shorten the Chain. 17 DIAGRAM 10 18 STEP 11 (See Diagram 11) A.) Attach a Butterfly Arm Pad (#24) to the Right Butterfly Arm (#14). Secure it with two M8 x 2” Allen Bolts (#74) and . 5/8” Washers (#52). Repeat the same procedure to install the other side. B.) Attach the Backrest Board (#23) to the Front Upper Vertical Frame (#5). Secure it with two M8 x 2 1/8” Allen Bolts (#49) and . 5/8” Washers (#52). C.) Attach the Seat Pad (#22) to the Main Seat Support (#7). Secure it with two M8 x 2 1/8” Allen Bolts (#49) and . 5/8” Washers (#52). D.) Attach the Arm Curl Pad (#25) to the Arm Curl Stand (#67). Secure it with two M8 x 5/8” Allen Bolts (#50) and . 5/8” Washers (#52). DIAGRAM 11 19 STEP 12 (See Diagram 12) A.) Insert two Foam Roll Tubes (#27) halfway through the holes on the Main Seat Support (#7) and Leg Developer (#11). Push four Foam Rolls (#26) onto the tubes. B.) Connect the Arm Curl Handle (#70) to the Lower Cable with two C-clips (#57) and one Long Chain (#79). Note: Remove the Arm Curl Handle and the Chain when using the Leg Developer. C.) Attach the Lat Bar to the Upper Cable with two C-clips (#57) and a Short Chain (#58).. DIAGRAM 12 20 PARTS LIST KEY NO. DESCRIPTION Q’ty 1 Rear Upper Vertical Beam 1 51 . 7/8” Pulley Bushing 2 2 Weight Holder 1 52 . 5/8” Washer 10 3 Rear Stabilizer 1 53 . .” Washer 54 4 Upper Frame 1 54 . 1 .” Washer 2 Front Upper Vertical Beam 1 55 M10 Aircraft Nut 38 6 Main Base Frame 1 56 M6 Aircraft Nut 2 7 Main Seat Support 1 57 C-clip 5 8 Front Press Stopper 1 58 Short Chain 2 9 Butterfly Pulley Frame 1 59 Butterfly arm Bushing 2 Butterfly Pulley Bracket 2 60 5 7/8” Axle 1 11 Leg Developer 1 61 . 1” Bushing 6 12 Front Press Base 1 13 Left Butterfly Arm 1 62 . .” Bushing 2 14 Right Butterfly Arm 1 63 M6 x 1 .” Allen Bolt 2 Left Storage Frame 1 64 . 1” Axle Washer 2 16 R...


Напишите ваш отзыв об устройстве



Текст отзыва
Ваше имя:
Введите две цифры:
capcha





Категории