
3. After the Nails reach the nose of the tool, close the Magazine (60) making sure the Retaining Spring (58) clicks shut. See Figure 1. Operating the Nailer 1. Attach the Nailer to the air supply at the Air Inlet (38). Start your compressor and check the pressure making sure it is set at the recommended 55-95 PSI and not to go over the maximum 95 PSI. 2. To fire, place the nose of the Nailer on the workpiece. The Nailer should not fire if the nose is not depressed. Once depressed, gently and bri