|
Фрагмент инструкции
Unthread HANDLE BASE (1) from DECK ADAPTER (2). Pull HANDLE ASSEMBLY off VALVE STEM (3). Remove SPRING CLIP (4). Lift STOP WASHER (5), turn 90° and replace. Replace SPRING CLIP (4). Find correct position of HANDLE ASSEMBLY by adjusting male teeth on VALVE STEM (3) to female teeth in HANDLE. Thread HANDLE ASSEMBLY onto DECK ADAPTER (2) until snug against mounting surface. 4 3 5 HANDLE ASSEMBLY REMOVE HANDLE 1 2 4 5 3 BOTTOM SPLINE END UP Push ADAPTER (1) on VALVE STEM (2), so that the hole of the ADAPTER (1) with the spline is facing up. Fig. A. Tighten STEM SCREW (3) to secure ADAPTER (1). Find correct position of LEVER HANDLE ASSEMBLY (4) by adjusting male teeth on ADAPTER (1) to female teeth in HANDLE (4). Thread LEVER HANDLE ASSEMBLY (4) onto DECK ADAPTER (5) until snug against mounting surface. THREAD ON TO DECK ADAPTER Fig. A. Hex wench (supplied) HANDSHOWER INSTALLATION (For 2064.901 only) Drop SPRAY ESCUTCHEON (1) through the fourth hole of the tub ledge (12" max from SPOUT center) with SPRAY ESCUTCHEON (1) directed towards tub center. Be sure RUBBER RING (2) is properly seated in SPRAY ESCUTCHEON (1). Install RUBBER WASHER (3), BRASS WASHER (4) and LOCKNUT (5) from underside of ledge. Secure SPRAY ESCUTCHEON (1) by tightening LOCKNUT (5). Install SEAL (9) and connect HOSE (10) to outlet nipple at the bottom of TEE (7). Tighten firmly. Slip SHOWER HOSE (8) with COUPLING NUT through SPRAY HOLDER (6) and SPRAY ESCUTCHEON (1). Note: SPRAY HOLDER (6) must be seperate from ESCUTCHEON (1) to pass HOSE (8) through ESCUTCHEON.(1) Insert SEAL (9) into SHOWER HOSE (8). Connect HOSE (8) to HOSE (10). Install SEAL (9) and connect HAND SHOWER (11) to SPRAY HOSE (8). When not in use, HANDSHOWER should be seated in the HOLDER. NOTE Before the bathroom is completely finished, you may want to remove spout, handshower, and handles to avoid damage during construction. To remove handles, reverse steps in section 4. To remove SPOUT (1), proceed as follows: Unthread LIFT ROD KNOB (2) and remove. Remove PLUG BUTTON (3) and remove SET SCREW (4) using 4mm !hex wrench supplied. Lift SPOUT (1) off SHANK (5) carefully and remove RUBBER RING (6). Unthread SHANK SLEEVE (7) and remove from SHANK (5). Reverse sequence to re-install SPOUT (1). Be sure RUBBER RING (6) is properly seated in its recess at the base of the SPOUT (1). Make certain SET SCREW (4) is properly aligned and tight so that SPOUT (1) is locked in place. 6 1 2 3 7 5 8 10 9 9 9 11 1 4 3 2 4 6 6 5 7 VIEW "A" VIEW "A" 7 MAKE WATER SUPPLY CONNECTIONS 8 9 7A With HANDLES in OFF position, turn on WATER SUPPLIES and check all connections for leaks. Operate both HANDLES to flush water lines thoroughly. Connect HOT water supply to LEFT INLET UNION (1) and COLD water supply to RIGHT INLET UNION (2). Pipe connections are 3/4" NPT. Use sealant or Teflon tape on pipe connections. Do not solder direct...
Эта инструкция также подходит к моделям:Сантехника - PORTSMOUTHTM 7420.921 (369.46 kb)
Сантехника - PORTSMOUTHTM 7420.901 (369.46 kb)
Сантехника - PORTSMOUTHTM 7420.9 (369.46 kb)
Сантехника - PORTSMOUTHTM 7420.901 (369.46 kb)