Войти:
Оценок - 3, средний балл: 3.3 ( )

Инструкция по эксплуатации Hans Grohe, модель PORTSMOUTHTM 7420.92

Производитель: Hans Grohe
Размер: 369.46 kb
Название файла: Install_4240.pdf
Язык инструкции:en
Перейти к скачиванию



Фрагмент инструкции


Be sure RUBBER RING (2) is properly seated in SPRAY ESCUTCHEON (1). Install RUBBER WASHER (3), BRASS WASHER (4) and LOCKNUT (5) from underside of ledge. Secure SPRAY ESCUTCHEON (1) by tightening LOCKNUT (5). Install SEAL (9) and connect HOSE (10) to outlet nipple at the bottom of TEE (7). Tighten firmly. Slip SHOWER HOSE (8) with COUPLING NUT through SPRAY HOLDER (6) and SPRAY ESCUTCHEON (1). Note: SPRAY HOLDER (6) must be seperate from ESCUTCHEON (1) to pass HOSE (8) through ESCUTCHEON.(1) Insert SEAL (9) into SHOWER HOSE (8). Connect HOSE (8) to HOSE (10). Install SEAL (9) and connect HAND SHOWER (11) to SPRAY HOSE (8). When not in use, HANDSHOWER should be seated in the HOLDER. NOTE Before the bathroom is completely finished, you may want to remove spout, handshower, and handles to avoid damage during construction. To remove handles, reverse steps in section 4. To remove SPOUT (1), proceed as follows: Unthread LIFT ROD KNOB (2) and remove. Remove PLUG BUTTON (3) and remove SET SCREW (4) using 4mm !hex wrench supplied. Lift SPOUT (1) off SHANK (5) carefully and remove RUBBER RING (6). Unthread SHANK SLEEVE (7) and remove from SHANK (5). Reverse sequence to re-install SPOUT (1). Be sure RUBBER RING (6) is properly seated in its recess at the base of the SPOUT (1). Make certain SET SCREW (4) is properly aligned and tight so that SPOUT (1) is locked in place. 6 1 2 3 7 5 8 10 9 9 9 11 1 4 3 2 4 6 6 5 7 VIEW "A" VIEW "A" 7 MAKE WATER SUPPLY CONNECTIONS 8 9 7A With HANDLES in OFF position, turn on WATER SUPPLIES and check all connections for leaks. Operate both HANDLES to flush water lines thoroughly. Connect HOT water supply to LEFT INLET UNION (1) and COLD water supply to RIGHT INLET UNION (2). Pipe connections are 3/4" NPT. Use sealant or Teflon tape on pipe connections. Do not solder directly to valve body. TEST INSTALLED FAUCET 3/4" X 3/4" NPT UNION (NOT SUPPLIED) HOT COLD 3/4" NPT HAND SHOWER TRANSFER KNOB 3/4" NPT 2 1 Lift HAND SHOWER from HOLDER, direct spray into tub. Lift TRANSFER KNOB to check HAND SHOWER and HOSES for leaks. Turn handles "off" and replace HAND SHOWER. IMPORTANT: It is strongly recommended that access be provided for all enclosed mechanical parts to this system. M965027 REV.1.6 DO: SIMPLY RINSE THE PRODUCT CLEAN WITH CLEAR WATER. DRY WITH A SOFT COTTON FLANNEL CLOTH. DO NOT: DO NOT CLEAN THE PRODUCT WITH SOAPS, ACID, POLISH, ABRASIVES, HARSH CLEANERS, OR A CLOTH WITH A COARSE SURFACE. CARE INSTRUCTIONS: ...

Эта инструкция также подходит к моделям:
Сантехника - PORTSMOUTHTM 7420.921 (369.46 kb)
Сантехника - PORTSMOUTHTM 7420.901 (369.46 kb)
Сантехника - PORTSMOUTHTM 7420.9 (369.46 kb)
Сантехника - PORTSMOUTHTM 7420.901 (369.46 kb)

Напишите ваш отзыв об устройстве



Текст отзыва
Ваше имя:
Введите две цифры:
capcha





Категории