|
Фрагмент инструкции
. WARNING: NEVER burn garbage or refuse in your furnace. Never try to ignite oil by tossing burning papers or other material into your furnace. . WARNING: Thermo Pride oil furnaces are designed to burn No. 1 or No. 2 distilate fuel oil. NEVER USE GASOLINE OR A MIXTURE OF OIL AND GASOLINE. . CAUTION: DO NOT ATTEMPT TO START THE BURNER WHEN: 1. Excess oil has accumulated, 2. The furnace is full of vapors 3. The combustion chamber is very hot. IF ONE OR MORE OF THESE CONDITIONS EXIST, CONTACT A QUALIFIED SERVICE PERSON. D. STARTING THE BURNER: 1. Turn the main service switch to "OFF" position. 2. Set thermostat substantially above room temperature. 3. Open shut-off valves in oil supply line to burner. 4. Turn service switch to furnace "ON". If burner starts and runs, but stops again on lockout, it may be necessary to bleed the lines or make burner combustion air adjustments. Contact a qualified service person to adjust and start burner. E. FILTER CLEANING AND LOCATION: The air filters should be inspected each month and cleaned when dirty. Cleaning the air filters frequently may reduce airborne contaminants from entering the furnace and depositing in the furnace, duct system and home. . WARNING: To avoid injury from moving parts, hot surfaces, or electrical shock, shut off the power to the furnace before removing any furnace access doors to service the air filters. OL Series (Lowboy) To clean a dirty filter, first remove the blower compartment door at the rear of the furnace, refer to figure 17. Remove the dirty filter from the filter rack and clean it with a mild soap and water solution. Make sure filter is thoroughly dry before replacing. Replace the blower compartment door. 13 All installations and services must be performed by qualified service personnel. Fig. 17: Location of the air filter and blower compartment access door on the typical lowboy furnace. OH Series (Highboy) The filter rack will be located between the return air plenum and the return air opening on the side of the furnace, refer to figure 18. Slide the dirty filter out, clean it with a mild soap and water solution. Make sure filter is thoroughly dry before replacing. Fig. 18: Location of the air filter on the typical highboy furnace. OC Series (Counterflow) For removal of the filter, remove front door of furnace. Then, remove blower access panel for access to filter, refer to figure 19. Clean filter by vacuuming, tap-water rinsing or washing in an ordinary detergent soloution. After cleaning, replace the completely dry filter mesh side down. Fig. 19: location of the air filters on a typical counterflow furnace. 14 All installations and services must be performed by qualified service personnel. COMBUSTION AND EFFICIENCY TESTING FOR THERMO PRIDE OIL FIRED CENTRAL FURNACES. Complete this form for each Thermo Pride furnace installed. Read instruction CUSTOMER NAME ADDRESS CITY, STATE HEATING SYSTEM BURNER MODEL NO. AIR SHUTTER OPENING INS. % OF MAX. (EST) FURNACE MODEL TYPE OF VENTING SYSTEM MASONRY CHIMNEY METAL CHIMNEY SIDEWALL POWER VENTER MASONRY CHIMNEY W/INDUCERMETAL CHIMNEY W/INDUCER MASONRY CHIMNEY W/METAL LINER FUEL LINE FILTER DRAFT CONTROL COMBUSTION TESTS (Operate burner at least 10 minutes before CO2 in stack pipe INITIAL SERVICE SERVICE SERVICEINSTALLATION Draft Over-fire Draft in stack pipe Smoke number Furnace room temp. Gross stack temp. Net stack temp. (Gross stack minus furnace room temp.) Efficiency Nozzle size and spray Date NOTES: INSTALLER NAME & ADDRESS manual carefully before making tests. Retain this form with furnace. BLAST TUBE LGTH. Tests taken by starting tests.) COMBUSTION CHAMBER CONDITION MATERIAL FURNACE SERIAL NUMBER Oil pump pressure Operation of Controls Burner Safety Controls Check for oil leaks 15 All installations and services must be performed by qualified service personnel. 16 APPENDIX-A Replacement Parts List All installations and services must be performed by qualified service personnel. 17 All installations and services must be performed by qualified service personnel. 18 All installations and services must be performed by qualified service personnel. 19 All installations and services must be performed by qualified service personnel. 20 All installations and services must be performed by qualified service personnel. 21 All installations and services must be performed by qualified service personnel. 22 All installations and services must be performed by qualified service personnel. 23 All installations and services must be performed by qualified service personnel. 24 All installations and services must be performed by qualified service personnel. 25 All installations and services must be performed by qualified service personnel. 26 APPENDIX-B Wiring Diagrams All installations and services must be performed b...
Эта инструкция также подходит к моделям:Электрообогреватели - OC2-56 (1.31 mb)
Электрообогреватели - OH11-105 (1.31 mb)
Электрообогреватели - OC5-85 (1.31 mb)
Электрообогреватели - OH16-125 (1.31 mb)