![](/images/flag/s/en.gif)
Never use pipe dope. To achieve a leak-free thread connection, turn the male fitting until it is finger tight, then add one or two more turns. Over-tightening can cause splitting and failure of the female threads. A Important: Ensure the Y-Filter, Jar Top Valve and Pressure Regulator are installed in the correct flow orientation. Flow direction arrows are provided on each component. Refer to Figure 1 and Figure 2. 1. Using the Close Nipple, install the Ball Valve to the Jar Top Valve inlet.