Jri,. __ _ 25-26 1S8 SÊ fl Hook base 2 1S2 ÎtŸÉft Gear box 3-8 10 1S9 Y Y direction driver system 27-29 3 1S3A № > n 3 9-12 11 1S10 X ft]ii?X direction driver system 30-32 4 1S3B Arm 13 - 15 12 1S11 tœift Frame 33-34 5 1S4 irfe M ^ Tension base 16-17 13 1S12 Thread trimmer mechanism 35-36 6 23S4 Tension base 18-19 14 1S13 Thread trimmer driving box 37-39 7 1S5 Î&1Ë.ÎI Color change system 20-22 15 1S14 ?F3èfl Bar switch box 40-41
Specifications subject to change without notice TYPICAL SEWING MACHINE WANPING MACHINERY CO.,LTD. ADD: WANPING TOWN, WUJIANG CITY, JIANGSU PROVINCE, CHINA TEL: +86-512-63391627 63391278 FAX: +86-512-63391371 63391627 POST. CODE: 215223 Http://E-mail:bzwf@public1.sz.js.cn Printed in July 2005 „” ./: (495) 989-22-97CONTENT CONTENTCONTENT Operation Instruction Operation InstructionOperation Instruction 1. Brief 1. Brief1. Brief introduction..........................................................
disc 2.disc 2. 3. Pass 3. Pass3. Pass down through down throughdown through the thread the threadthe thread tension disc tension disctension disc 3. 3.3. 4. T 4. T4. To left o lefto left pass through pass throughpass through the thread the threadthe thread control assembly control assemblycontrol assembly 4. 4.4. 5. Pass 5. Pass5. Pass up through up throughup through the upper the upperthe upper thread guide thread guidethread guide 5,then pass 5,then pass5,then pass through the through thethrou
FRAME COMPONENTS No. for Singer Model Description Machine Arm Machine Bed Arm Screw Arm Pin 42145 Cloth Plate 42005 Cloth Plate Lock Spring 236 Cloth Plate Lock Spring Screw 1437 Cloth Plate Hinge Screw 1655 Cloth Plate Nut 42029 Top Cover 42018 Feed Regulator Indicator Plate 1253 Feed Regulator Indicator Plate Screw 742 Top Cover Screw 42027 Left Cover Assembly 42028 Right Cover Assembly 830 Left / Right Cover Screw Oscillating Shaft Oil Tube Assembly Trade Mark Plate Trade Mark Plate Pin
Remove the rubber plug (A) on the top of arm and drip a little oil, then remove the rubber plug (B)and replenish sufficient amount of oil, then lift the presser foot and run the machine at a low speed of 2000 spm to check oil distributing condition through oil check window. When lubricating is normal, keep the machine run in at this speed for 30 minutes, then increase the running speed gradually, after one month run -in operation, the machine can be run at the Max speed under normal working cond
4-7 Screw rf‘ 4-25 Slide Block Guide 1 * 8 4-9-3 Knife Moving -Л ' 26 4-1 Lock Nut 2 9 4-6 Ktjife tension Spring 1 27 5 . 4-2 Stud Slide Block Adiusting Support 2 10 S38 Screw -. 28 4 — 24 El ••• Slide Block Adjusting 4;: - /': : 1 11 4-4 ■' » ' 1 29 Gfi9?a-85 . .A: ? ’ > 5m/m Washer ’' * ■ ■* < 12 4-5 Knife Bracket Pin 1 30 4-23 * ■ r. * ... . Lock Bolt ,.v .....- ",2 13 4-12 Screw 1 31 GB5782—86 Screw 1 3 14 4-14 ; v . . *v._. Feed Dog f i; / 32 4-9-2 Ball l 15 4-10 ■ • • '' ■ Scre
Machine body „” ./: (495) 989-22-97A. Machine body No. Ret. Description Ot. 2 BX54735000 Rubber cap, 27.5 2 3 BX54732001 Top cover 1 4 BX54729000 Packing, top cover 1 5 B048399098 Screw, pan SM4. 76 -32 x 10 8 6 B969862009 Spring holder 1 7 B905876007 Nut SM4. 37 1 8 BX54676009 Sub shaft cover assy 1 8-1 BX54733001 Sub shaft cover 1 8-2 B959857009 5x16 shaft 1 9 BX54609000 Packing, sub shaft cover 1 10 B048349498 Screw, pan SM5. 95 -28 x 16 6 11 BX54734000 Cover, oil rejecter 1 12 B040430298 Sc
.......... 20. Переключение на прямострочный стежок........................................... 21. Установка защитного кожуха приводного ремня.................................. 22. Установка коленоподъемника (201123/230/33/43/143, 457А/В/0)............ 23. Установка коленоподъемника (201153/53А/63)..................................... 24. Виды стежков и использование сменных деталей............................... 25 Основные технические характеристики......................................
TYPICAL SEWING MACHINE WANPING MACHINERY CO.,LTD. ADD: WANPING TOWN, WUJIANG CITY, JIANGSU PROVINCE, CHINA TEL: 86-512-63391627 63391278 FAX: 86-512-63391371 POST. CODE: 215223 Http://E-mail:bzwf@public1.sz.js.cn CONTENTS 1. Brief introduction 1 2. Main specifications 1 3. Machine installation and operation preparation 1 1. Machine installation 1-3 2. Operation preparation and notice before running 3-4 4. Machine operation 5-6 1. Coordination among needle, thread and materials 5 2. Install the n