Войти:
Оценок - 3, средний балл: 4 ( )

Инструкция по эксплуатации Crown, модель 24-11

Производитель: Crown
Размер: 6.19 mb
Название файла:
Язык инструкции:en
Перейти к скачиванию



Фрагмент инструкции


If necessary, place a lifting bar (crowbar) under the center of the section and lift the nipple port onto the upper nipple. k. Drive section in place with a heavy block of wood, striking blows as squarely as possible over nipple port. l. The large draw-up rod lugs with dual holes are cast in the four (4) corners of each casting. Starting with the upper holes, install four (4) 5/8” x 9%” long draw-up rods along with washers and nuts (see Figure 9). CAUTION To avoid damage to the draw-up rod threads while drawing up sections, apply oil or other lubricant to tie rod threads while assembling sections to prevent stripping of threads on rod and to make assembling easier. m. DRAW UP SECTION SLOWLY AND EVENLY using an alternating pattern starting with the upper right lug and proceeding to the lower left , lower right and finishing with upper left lug. 15 Figure 9: Draw-Up Rods (Alternating Pattern -Manual Draw-up) When you start, grind surfaces between adjoining sections should be approximately 3/8” apart. Use three (3) or four (4) passes at tightening the four (4) draw-up rods a little at a time so that sections are pulled up evenly. During the last pass, pay close attention to the silastic sealant as it squeezes when the sections come in close contact. The silastic sealant will continue to squeeze out wafer thin until the sections are connected metal to metal. While tightening the nuts, close attention should be given to the connection area to determine that the silastic has stopped squeezing out from between the sections. This will give assurance that the sections are assembled metal to metal. If the silastic has stopped squeezing out from the connection and the sections still do not appear to be drawn metal to metal, measure any gaps between the sections with a feeler gauge. A maximum gap of .025” is acceptable. Gaps should be measured at the outer edge of the connection. DO NOT PUNCTURE THE GASKET CREATED BY THE FIBERGLASS ROPE AND SILASTIC SEALANT WITH THE FEELER GAUGE. WARNING Do not over torque draw up nuts after grind surfaces meet. KEEP NIPPLES ALIGNED WITH NIPPLE PORTS. If necessary, tap edge of nipples lightly with a blunt tool or rod to keep nipples from cocking while sections are being drawn-up. DO NOT DRAW UP SECTION WHEN NIPPLES ARE COCKED. If the torque required becomes excessive, periodically place a heavy block of wood over each nipple port and strike as squarely as possible with several blows to relieve tension on the draw-up rods. n. CONTINUE ASSEMBLING SECTIONS IN THEIR RESPECTIVE ORDER alternating the draw-up rods from the upper to lower set of holes in draw-up lugs. Be certain that all sections are drawn up IRON-TO-IRON at all three (3) nipple ports. BE SURE TO APPLY THE SEALANT to the groove in the ground joints between adjacent sections as the boiler operates with a positive pressure in the firebox and products of combustion will escape between sections unless the sections are properly sealed. The sealant should be applied before each section is placed on the assembly. o. If a joint springs apart it must be redrawn tight within four (4) hours of the time of application of Silastic to that joint. 2. ASSEMBLY OF SECTIONS (HYDRAULIC DRAW-UP) The entire boiler assembly may be drawn up at one time using hydraulic draw-up equipment providing the operation is completed within four (4) hours after application of the sealant. a. Repeat steps 1a through 1k under “Field Assembled Sections (Manual Draw-Up).” b. Continue driving sections in place (in their respective order) until all sections are in the assembly. Ground surfaces between adjoining sections should be spaced 1/4” to 3/8” apart. Spacing of more than 3/8” will limit number of sections that can be drawn up in one unit and could indicate cocked nipples. WARNING Sealant must be properly applied to ALL grooves. Failure to properly seal the boiler joints will result in combustion gas leaks through to joint. DO NOT operate boiler with co mbustion gas leaks. The sealant should be applied before each section is placed on the assembly. On long boiler assemblies, it may be necessary to draw-up a partial block if the entire boiler is not ready to be drawn-up tight within four (4) hours of the first application of Silastic. If the block assembly time extends overnight, the partial block completed must be drawn-up tight before leaving the boiler overnight. If a joint springs out, it must be redrawn tight within four (4) hours of first application of Silastic to the joint. c. Insert the three (3) %” draw-up rods (and couplings, if appropriate) through the tapped holes in the rear section extending them through the 16 tapped holes in the front section. Be sure to screw draw-up rods into couplings far enough to prevent stripping threads. d. Place a 3” x 12” lg. steel channel on each end of the upper draw-up rod and a 3” x 8/” lg. steel channel on each end of the lower draw-up rods. Refer to Figures 10 and 11 for proper placement ...

Эта инструкция также подходит к моделям:
Водонагреватели - 24-03 (6.19 mb)
Водонагреватели - 24-10 (6.19 mb)
Водонагреватели - 24-12 (6.19 mb)
Водонагреватели - 24-04 (6.19 mb)

Напишите ваш отзыв об устройстве



Текст отзыва
Ваше имя:
Введите две цифры:
capcha





Категории