Войти:
Оценок - 6, средний балл: 4.2 ( )

Инструкция по эксплуатации Burnham, модель CHG CHG150

Производитель: Burnham
Размер: 5.5 mb
Название файла: 5d01f385-d38a-42da-8e3a-70dbb23aa87d.pdf
Язык инструкции:en
Перейти к скачиванию



Фрагмент инструкции


For assistance or additional information, consult a qualified installer, service agency or the gas supplier. This boiler requires a special venting system. Read these instructions carefully before installing. 100343-01-3/06 Table of Contents I. Product Description..................................................................3 II. Specifications...........................................................................3 III. Before Installing........................................................................4 IV. Locating The Boiler...................................................................4 V. Air For Ventilation.....................................................................6 VI. Venting......................................................................................8 A. Vent System Design...........................................................8 B. Removing An Existing Boiler From Common Chimney......15 C. Vent/Intake System Assembly............................................15 VII. Condensate Drain Line.............................................................20 VIII. Gas Piping................................................................................22 IX. System Piping........................................................................... 23 A. General System Piping Precautions .................................. 23 B. System Design ................................................................... 23 C. Standard Piping Installation Requirements........................32 D. Piping For Special Situations ............................................. 33 X. Wiring ....................................................................................... 35 XI. Start-up and Checkout..............................................................39 XII. Operation..................................................................................44 XIII. Service and Maintenance.........................................................49 XIV. Troubleshooting........................................................................51 XV. Parts ........................................................................................ 55 Appendix A Special Requirements For Side-Wall Vented Appliances In The Commonwealth of Massachusetts.........68 Warranty.................................................................Back Cover 2 I Product Description The CHG is an aluminum gas fired condensing boiler designed for use in forced hot water heating systems requiring supply water temperatures of 180°F or less. This boiler may be vented vertically or horizontally with combustion air supplied from outdoors. This boiler is not designed for use in gravity hot water systems or systems containing significant amounts of dissolved oxygen. II Specifications Figure 2.1: General Configuration Table 2.2: Specifications MODEL* NO. OF SECTIONS MAXIMUM INPUT (BTU/hr) MINIMUM INPUT (BTU/hr) D.O.E. HEATING CAPACITY (BTU/hr) IBR NET RATING (BTU/hr) AFUE (%) VENT COLLAR DIAMETERS (IN.) INLET EXHAUST CHG150 3 150,000 30,000 135,000 117,000 93.1 4 3 CHG225 4 225,000 56,250 202,000 176,000 94.2 4 4 * MODELS SHOWN ARE FOR NATURAL GAS. ADD “LP" SUFFIX TO MODEL NUMBER SHOWN FOR PROPANE MODEL NUMBER (ie CHG225LP). PERFORMANCE RATINGS ARE THE SAME FOR BOTH FUELS. 3 III Before Installing 1) Safe, reliable operation of this boiler depends upon installation by a professional heating contractor in strict accordance with this manual and the authority having jurisdiction. • In the absence of an authority having jurisdiction, installation must be in accordance with this manual and the National Fuel Gas Code, ANSI Z223.1. • Where required by the authority having jurisdiction, this installation must conform to the Standard for Controls and Safety Devices for Automatically Fired Boilers (ANSI/ASME CSD-1). 2) CHG boilers utilize aluminum heat exchangers constructed, tested, and stamped in accordance with ASME Boiler and Pressure Vessel Code Case 2382-2. Some jurisdictions which require ASME boiler construction do not recognize this Code Case and may not approve the installation of an aluminum boiler. Consult the authority having jurisdiction before installing this boiler. 3) Read Section VI to verify that the maximum combustion air and exhaust pipe lengths will not be exceeded in the planned installation. Also verify that the vent terminal is installed in the proper location. 4) Make sure that the boiler is correctly sized: • For heating systems employing convection radiation (baseboard or radiators), use an industry accepted sizing method such as the I=B=R Heat Loss Calculation Guide (Pub. #H21 or #H22) published by the Hydronics Institute in Berkeley Heights, NJ. • For new radiant heating systems, refer to the radiant tubing manufacturer’s boiler sizing guidelines. • For systems including an Alliance™ indirect water heater, size the boiler to ha...

Эта инструкция также подходит к моделям:
Водонагреватели - CHG CHG225 (5.5 mb)

Напишите ваш отзыв об устройстве



Текст отзыва
Ваше имя:
Введите две цифры:
capcha





Категории