Войти:
Оценок - 4, средний балл: 3.5 ( )

Инструкция по эксплуатации Cissell, модель L36URD36G

Производитель: Cissell
Размер: 341.47 kb
Название файла: 35083da2-dadc-49e3-a9b4-fe6b1216213a.pdf
Язык инструкции:en
Перейти к скачиванию



Фрагмент инструкции


This will cause inadequate drying of the clothes load. IMPORTANT The dryer and its individual shutoff valve must be disconnected from the gas supply piping system during any pressure testing of that system at test pressures in excess of 1/2 PSIG. IMPORTANT The dryer must be isolated from the gas supply piping system by closing its individual manual shutoff valve during any pressure testing of the gas supply piping system at test pressures equal to or less than 1/2 PSIG. Page 17 Gas Piping Installation (Illustration) The dryer and it’s individual shutoff valve must be disconnected from the gas supply piping system during any pressure testing of that system at test pressures in excess of 1/2 PSIG. The dryer must be isolated from the gas supply piping system by closing it's individual manual shutoff valve during any pressure testing of the gas supply piping system at test pressures equal to or less than 1/2 PSIG. Page 18 Gas Service Installation Instructions GAS SERVICE INSTALLATION INSTRUCTIONS The size of the gas service pipe is dependant upon many variables, such as tees, lengths, etc. Specific pipe size should be obtained from the gas supplier. Refer to the “Gas Pipe Size” chart in this manual for general gas pipe size information. CAUTION: Gas loop piping must be installed as illustratedto maintain equal gas pressure for all dryers connected to a single gas service Other gas-using appliances should be connected upstreamfrom the loop. GAS PRESSURE REGULATOR FOR LIQUIFIED PETROLEUM GASES WARNING: LIQUIFIED PETROLEUM GASES ONLY ! A Gas Pressure Regulator for Liquified Petroleum Gases is not furnished on Cissell Gas Heated Clothes Dryers. This regulator is normally furnished by the installer. In accordance with American Gas Association (AGA) standards, a gas pressure regulator, when installed indoors, must be equipped with a vent limiter or a vent line must be installed from the gas pressure regulator vent to the outdoors. Page 19 Gas Pipe Size Chart TOTAL BTU/HR (for LP Gas correct total BTU/HR below by multiplying by .6) TOTAL KCAL GAS PIPE SIZE FOR 1000 BTU (250 KCAL) NATURAL GAS AT 7” (17.8 CM) W.C. PRESSURE In figuring total length of pipe, make allowance for tees and elbows. HOUR (25 ft.) 7,62 m (50 ft.) 15,24 m (75 ft.) 22,86 m (100 ft.) 30,48 m (125 ft.) 38,1 m (150 ft.) 45,72 m 60,000 15000 3/4 3/4 3/4 3/4 3/4 3/4 80,000 20000 3/4 3/4 3/4 1 1 1 100,000 25200 3/4 3/4 1 1 1 1 120,000 30200 3/4 1 1 1 1 1 140,000 35200 3/4 1 1 1 1 1 1/4 160,000 40300 3/4 1 1 1 1/4 1 1/4 1 1/4 180,000 45300 1 1 1 1 1/4 1 1/4 1 1/4 200,000 50400 1 1 1 1/4 1 1/4 1 1/4 1 1/2 300,000 75600 1 1 1/4 1 1/4 1 1/2 1 1/2 1 1/2 400,000 100800 1 1/4 1 1/4 1 1/2 1 1/2 1 1/2 2 500,000 126000 1 1/4 1 1/2 1 1/2 2 2 2 600,000 151200 1 1/2 1 1/2 2 2 2 2 700,000 176400 1 1/2 2 2 2 2 2 1/2 800,000 202000 1 1/2 2 2 2 2 1/2 2 1/2 900,000 230000 2 2 2 2 1/2 2 1/2 2 1/2 1,000,000 250000 2 2 2 2 1/2 2 1/2 2 1/2 1,100,000 270000 2 2 2 1/2 2 1/2 2 1/2 2 1/2 1,200,000 300000 2 2 2 1/2 2 1/2 2 1/2 2 1/2 1,300,000 330000 2 2 1/2 2 1/2 2 1/2 2 1/2 3 1,400,000 350000 2 2 1/2 2 1/2 2 1/2 3 3 1,500,000 380000 2 2 1/2 2 1/2 2 1/2 3 3 1,600,000 400000 2 2 1/2 2 1/2 3 3 3 1,700,000 430000 2 2 1/2 2 1/2 3 3 3 1,800,000 450000 2 1/2 2 1/2 3 3 3 3 1,900,000 480000 2 1/2 2 1/2 3 3 3 3 2,000,000 504000 2 1/2 2 1/2 3 3 3 3 1/2 2,200,000 550000 2 1/2 3 3 3 3 1/2 3 1/2 2,400,000 605000 2 1/2 3 3 3 3 1/2 3 1/2 2,600,000 650000 2 1/2 3 3 3 1/2 3 1/2 3 1/2 2,800,000 705000 2 1/2 3 3 3 1/2 3 1/2 3 1/2 3,000,000 750000 2 1/2 3 3 1/2 3 1/2 3 1/2 4 3,200,000 806000 3 3 3 1/2 3 1/2 3 1/2 4 3,400,000 850000 3 3 1/2 3 1/2 3 1/2 4 4 3,600,000 907000 3 3 1/2 3 1/2 3 1/2 4 4 3,800,000 960000 3 3 1/2 3 1/2 4 4 4 4,000,000 1000000 3 3 1/2 3 1/2 4 4 4 Page 20 Steam Piping Installation Instructions STEAM PIPING INSTALLATION INSTRUCTIONS 1. Set and anchor dryer in position. Machine should be level to assure proper steam circulation. 2. To prevent condensate draining from headers to dryer, piping should have a minimum 12” above respective header. Do not make steam connection to header with a horizontal or downwardly facing tee or elbow. 3. Whenever possible, horizontal runs of steam lines must drain, by gravity, to respective steam header. Water pockets, or an imporperly drained steam header will provide wet steam, causing improper operation of dryer. If pockets or improper drainage cannot be eliminated, install a by-pass trap to drain condensate from the low point in the steam supply header to the return. 4. In both steam supply and steam retyrn line, it is recommended that each have a 1” union and 1” globe valve. This will enable you to disconnect the steam connections and service the dryer while your plant is in operation. 5. Before connecting trap and check valve to dryer, open globe valve in steam supply line and allow steam to flow through dryer to flush out any dirt and scale from dryer. This will assure proper operation of trap when connected. 6. After flushing system, install...

Эта инструкция также подходит к моделям:
Сушильные машины - L36URD36E (341.47 kb)
Сушильные машины - L36URD36S (341.47 kb)
Сушильные машины - L36URS36E (341.47 kb)
Сушильные машины - L36URS36G (341.47 kb)

Напишите ваш отзыв об устройстве



Текст отзыва
Ваше имя:
Введите две цифры:
capcha





Категории