Войти:
Скачали: 0   Размер: 4 mb   Производитель: HP  
Категория: Сантехника
@name

Swept or formed bends will give the best performance. IMPORTANT: The water circuit should be installed such that the flow is not significantly affected by other taps and appliances being operated elsewhere on the premises. Water pressure must not fall below specification of the shower. Note: The hot water pipe entry must be on the left. Rising and falling supplies Having decided on the position of the shower and direction of pipe entry, complete the pipework to the shower area. Note: The fi

Скачали: 0   Размер: 135 kb   Производитель: HP  
Категория: Сантехника
@name

3-phase 3450 184JM 1-. 165 5571-95 7.5 230/460 VAC, 60 Hz. 3-phase 3450 184JM 1-. 150 5572-95 5 230/460 VAC, 60 Hz. 3-phase 3450 184JM 1-. 130 NOTE: Driver data is subject to change without notice, see label on driver for actual specifications. (*) Standard NPT (female) pipe thread Performance Chart GPM of Water at Total Head in Feet Max. Model HP 60 70 80 90 100 110 120 130 140 150 Head† 4445-95 3 805525-------85 ft. 4446-95 3 805525-------85 ft. 5572-95 5 * 115 100 80 50 -----110 ft. 5571-95 7





Категории