
Swept or formed bends will give the best performance. IMPORTANT: The water circuit should be installed such that the flow is not significantly affected by other taps and appliances being operated elsewhere on the premises. Water pressure must not fall below specification of the shower. Note: The hot water pipe entry must be on the left. Rising and falling supplies Having decided on the position of the shower and direction of pipe entry, complete the pipework to the shower area. Note: The fi