Войти:
Оценок - 4, средний балл: 3.8 ( )

Инструкция по эксплуатации Omnimount, модель PMD1

Производитель: Omnimount
Размер: 353.1 kb
Название файла: 7fc59703-0bdb-419e-bb62-268186c2b016.pdf
Язык инструкции:en
Перейти к скачиванию



Фрагмент инструкции


6 Determine required mounting screw size ( 4, 5 or 6 mm) for projector. Note: Consult projectors owners’ manual for screw sizes and mounting holes. Lay projector on table with mounting surface face up. Place grid section of bottom projector mounting plate onto top of projector in desired mounting orientation (horizontal or vertical). (Fig. 6) Using a pencil or felt tipped pen, mark the locations of the projectors threaded inserts onto the grid for refer- Part Projector Mounting Hardware Qty. Bag Hardware Bags 1 Large Washer 8 (a) 2 Metal Spacer: 3/ 8” 4 (a) 3 Plastic Spacer: 1” 1 (b) PMD–.5 /PMD–1 PMD- 2 4 Screw: 5mm x 25mm Screw: 6mm x 25mm 4 (c) 5 Screw: 4mm x 25mm Screw: 5mm x 25mm 4 (c) 6 Screw: 3mm x 25mm Screw: 4mm x 25mm 4 (c) Step 1 ence. (Fig. 7) Verify that the dimensions (H x W) of the mounting lands on y0ur projector fall within the mounting grid footprint for your PMD mount. Fig. 7 PMD .5 Place a large washer (1) over mounting screw, and PMD 1 then insert screw through grid at marked location. (Fig. 8) Fig. 8 Lift the projector mounting plate and place a second large washer ( 1) onto the end of the screw, followed by a metal spacer ( 2). Loosely thread ( 2- 3 turns) screw as- PMD 2 sembly into the chosen threaded insert on the bottom of the projector. (Fig. 9) Fig. 9 Repeat this procedure for the remaining threaded inserts. (Fig. 10) Note: A 1” plastic spacer ( 3) is included for projectors with uneven mounting surfaces. Trim the plastic spacer to the required length, and install on appropriate mounting screw. Fig. 10 Once all mounting screws have been installed, square up the projector mounting plate, and then tighten the mounting screws securely. Caution: Do not force or over tighten the mounting screws, or damage to the projector may occur. 3 Step 2 With an electronic stud finder, locate center of ceiling stud in desired mounting location. Unscrew ceiling plate ( E) from Projector Mounting top plate ( A). Use ceiling plate as a template, and mark mounting hole locations. Drill mounting holes to a depth of 3” using a 3/ 16” drill bit. Mount ceiling plate to stud with 5/ 16” lag bolts ( J). Step 3 Determine type of installation: • Standard Ceiling Mount • Extended Ceiling Mount • Flush Mount • Wall Mount Standard Ceiling Mount Press plastic cover ( D) into place over ceiling plate. Attach pipe drop assembly ( C) to ceiling plate with three 5/ 8” hex screws ( H) . Note: Orient the cable management port on the pipe drop assembly so that it faces the projector cable drop. Extended Ceiling Mount For installations that require a ceiling drop in excess of 18”, standard 1 .” pipe may be used to extend the standard pipe drop assembly. Pipe extension should be cut to the required additional length, threaded on both ends, and then attached to the standard pipe drop assembly with a pipe coupler (not supplied). Note: Orient the cable management port on the pipe drop assembly so that it faces the projector cable drop. Flush Ceiling Mount For ins...

Эта инструкция также подходит к моделям:
Проекторы - PMD.5 (353.1 kb)
Проекторы - PMD2 (353.1 kb)

Напишите ваш отзыв об устройстве



Текст отзыва
Ваше имя:
Введите две цифры:
capcha





Категории