Войти:
Оценок - 3, средний балл: 3 ( )

Инструкция по эксплуатации Arrow Storage Products, модель 697.68101

Производитель: Arrow Storage Products
Размер: 1.91 mb
Название файла: L0807041.pdf
Язык инструкции:en
Перейти к скачиванию



Фрагмент инструкции


* Grey color . Brackets, braces, . 3 shelves hardware included. * Holds up to 85 Ibs. (38kg) Lumber is not included. (even weight distribution) * Some drilling required to fit buildings without mid-wall bracing. THIS PAGE WAS LEFT BLANK INTENTIONALLY THIS PAGE WAS LEFT BLANK INTENTIONALLY Foundation S09 The Foundation For Your Building OPTION 1: ARROW FLOOR FRAME KIT: (orderNo.FB109-ASR68385-A) or Arrow has the best base for your building in this simple kit. It keeps stored items above the ground. This kit should be used with one of the following: A. To support a plywood deck B. To be filled with sand. We recommend the combined use of f. an ARROW FLOOR FRAME KIT and 2. an ARROW ANCHORING KIT as an effective method of securing the building to the ground. Allow I -2 hours for construction. OPTION 2: Wood Platform if you decide to build your own foundation, be sure to select the appropriate materials. These are the recommended materials for your foundation: • 2 x 4's (5cm x 10cm) Pressure Treated Lumber O 5/8" (1,5cm) 4 x 8 (122cm x 244cm) Plywood-exterior grade ® 10 & 4 penny Galvanized Nails ® Concrete Blocks (optional) The platform should be level and fiat (free of bumps, ridges etc.) to provide good support for the building. The necessary materials may be obtained from your local lumber yard. To construct the foundation follow instructions and diagram, Construct frame (using 10 penny galvanized nails) Measure 16"/24" (40,6cm/61 cm) sections to construct inside frame (see diagram) Secure plywood to frame (using 4 penny galvanized nails) Allow 6 -7 hours for construction. Note: Platform/Slab will extend 9/16" (1,4era) beyond floor frame on all four sides. Seal this 9/16" of wood with a roofing cement (not included), or bevel this 9/16" of concrete when pouring, for good water drainage. OPTION 3: Concrete Slab The slab should be at least 3" to 4" (8-10cm) thick. It must be level and flat to provide good support for the frame. The following are the recommended materials for your foundation. • 1 x 4's (2,5cm x 10cm) (will be removed once the concrete cures) O Concrete O Sheet of 6 rail plastic • We recommend for a proper strength concrete to use a mix of: 1 part cement ® 3 parts pea sized gravel ® 2 1/2 parts clean sand Prepare the Site/Construct a Foundation 1. Dig a square, 6" (15cm) deep into the ground (remove grass). 2. Fill up to 4" (10cm) in the square with gravel and tamp firm. 3. Cover gravel with a sheet of 6 rail plastic. 4. Construct a wood frame using four planks of lx4 (2,5cm x 10cm) FRONT 3 lumber. (DOOR) 5. Pour in concrete to fill in the hole and the frame giving a total of 4" (8-10cm) thick concrete. Be sure surface is level. Note: Finished Slab dimensions, with lumber removed. Allow 3 -5 hours for construction and a week for concrete curing time. Anchoring _\ll) it is important that the entire floor frame be anchored after the building is erected. Below are recommended ways of anchoring. Arrow Anchoring Kit: (Model No. AK4 or 60298) Recommended for use with any suggested base. Contains: 4 Anchors with Cable, Clamps and installation instruction. Anchoring Use 1/4" Wholes providinto Wood/Post: ed in the frames ood Screws. Thefor proper anchoring. re are 1/4" (0,83cm) dia. 1. J" OVER THE BEAMS AND INTO THE GROUND Arrow Anchoring Kit: (Model No. AK100 or 88383) Anchoring into Concrete: Recommended for use with the concrete foundation. 1. For poured concrete slab or footing or patio blocks: Contains: Corner gussets, perimeter clips, hardware, Use 1/4" x 2" Lag Screws. 1/4" masonary drill bit and installation instruction. 2. For Anchor Post of Concrete poured after building is erected: Use 1/4" x 8" Lag Screws. 2. Hardware SII Remove from bag of screws and save for the last step T TT 65900A 65103 #10Bxl/2" Black Screw(8) 65923 65004 #8-32 Hex Nnt (165} (Packed with Screws) #8=32.3/8" Bolt (165) #8Ax5/16" Screw (336} 66646 65109 67468 66045 Washer(361 ) #8-32 Acorn Nut (4) Peak Cap (2) Handle (2) (10 sheets of 40) (Packed with Screws) (Arrow Logo) 66183 66769 66382 Roof Trim Cap 6228 Door Slide (4) Lower Door Guide (4) (2 right & 2 left) Track Support (2) 5971 67545 Roof Beam Bracket (4) Weather Stripping (1) Parts List LINI2 Assembly Key No. 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 Part Number 3719 5986 6000 6001 6015 10497 9355 6403 9156 8995 6529 6635 6640 6641 6869 9917 10489 10489 8934 8936 9923 9294 9295 9298 9299 9365 9366 9367 9900 9372 Part Description Door Handle Brace Rear Wall Angle Right Gable Left Gable Side Roof Trim Horizontal Door Brace Vertical Door Brace Door Track Splice Corner Panel Wall Panel Roof Panel Gable Brace Right Roof Panel Left Roof Panel Ridge Cap Rear Wall Channel Right Door Left Door Ramp Rear Floor Frame Side Wall Channel Right Roof Beam Left Roof Beam Side Wall Angle Side Floor Frame Front Wall Channel Door Track Front Floor Frame Door Jamb Front Wall Panel Quantity Check in Carton List 2 2 2 2 4 4 2 1 4 8 4 2 2 2 2 2 1 1 1 ...

Эта инструкция также подходит к моделям:
Прочие аксессуары для дома - KM1010 (1.91 mb)
Прочие аксессуары для дома - SC1010 (1.91 mb)

Напишите ваш отзыв об устройстве



Текст отзыва
Ваше имя:
Введите две цифры:
capcha





Категории