|
Фрагмент инструкции
If MOUNTING BRACKET (1) is secured to a stud or cross brace drill small pilot holes for SCREWS (3). (NOTE PROPER POSITION OF MOUNTING BRACKET FOR ACCESSORY TO BE INSTALLED.} For installations on drywall or tiled walls, use ANCHORS (4) and SCREWS (2) for securing MOUNTING BRACKETS (1) to wall. Use MOUNTING BRACKET (1) as a template and mark the mounting holes. Drill three 1/8" diameter holes a minimum of 1-1/4" deep. Insert the three ANCHORS (4) flush with face of the finished wall. Secure MOUNTING PLATES (1) to wall with SCREWS (2). POSITION OF MOUNTING BRACKET FOR TOWEL RING AND ROBE HOOK ■ CENTER LINE DRILL З PILOT HOLES FOR WOOD SCREWS (г) OR 1/B" DIA. HOLES FOR ANCHORS (4) POSITION OF MOUNTING BRACKET FOR DOUBLE ROBE HOOK AND TISSUE HOLDER 1 2 TOWEL RING INSTALLATION ■ Align accessory (A, B) and place ESCUTCHEON (1) onto MOUNTING BRACKET (2). Secure accesory with SET SCREW (3) using 2.5mm HEX WRENCH (4) supplied. (NOTE POSITION OF MOUNTING BRACKET.} 2 POSITION OF MOUNTING BRACKET FOR TOWEL RING AND ROBE HOOK 2 ROBE HOOK AND TISSUE HOLDER INSTALLATION Align accessory (C, D) and place ESCUTCHEON (1) onto MOUNTING BRACKET (2). Secure accesory with SET SCREW (3) using 2.5mm HEX WRENCH (4) supplied. (NOTE POSITION OF MOUNTING BRACKET.} 3 2 HOOK AND TISSUE HOLDER M968630 Rev. 1 .1...
Эта инструкция также подходит к моделям:Принадлежности для ванной - 7010.19 (86.62 kb)
Принадлежности для ванной - 7010.211 (86.62 kb)
Принадлежности для ванной - 7010.23 (86.62 kb)