|
Фрагмент инструкции
IEC Power Cable VGA, PS/2 Cable Kit Bracket Kit 15", 17", or 19" LCD Rack Console Bracket Screws Quick Installation Guide Keys Introduction Specifications Material Heavy-duty steel Power Auto-switching 100 to 240VAC 50 to 60Hz 48 watts Net Weight 29.0 lbs. (13.2kg.) [F1DC100P-SR] 31.0 lbs. (14.1kg.) [F1DC101P-SR] 34.7 lbs. (15.7kg.) [F1DC102P-SR] Unit Dimensions 19 (W) x 21.7 (D) x 1.70 (H) in. (482.6 x 551.2 x 43.18mm) [F1DC100P-SR and F1DC101P-SR] 19 (W) x 23.6 (D) x 1.70 (H) in. (482.6 x 599.4 x 43.18mm) [F1DC102P-SR] Minimum Rack-Mount Depth 21.5 in. (546.1mm) [F1DC100P-SR, F1DC101P-SR, and F1DC102P-SR] Maximum Rack-Mount Depth 31.5 in. (800.1mm) [F1DC100P-SR, F1DC101P-SR, and F1DC102P-SR] Display Type 15" TFT/LCD active-matrix color [F1DC100P-SR] 17" TFT/LCD active-matrix color [F1DC101P-SR] 19" TFT/LCD active-matrix color [F1DC102P-SR] Resolution Up to 1024x768 [F1DC100P-SR] Up to 1280x1024 [F1DC101P-SR and F1DC102P-SR] Contrast Ratio 400:1 [F1DC100P-SR] 450:1 [F1DC101P-SR] 1000:1 [F1DC102P-SR] Brightness 250 cd/m2 typical [F1DC100P-SR] 300 cd/m2 typical [F1DC101P-SR and F1DC102P-SR] Specifications Pixel Pitch 0.297mm [F1DC100P-SR] 0.264mm [F1DC101P-SR] 0.294mm [F1DC102P-SR] Panel Color 16.0 million display colors [F1DC100P-SR] 16.2 million display colors [F1DC101P-SR] 16.7 million display colors [F1DC102P-SR] Response Time Rising 5ms, Falling 13ms [F1DC100P-SR] Rising 3ms, Falling 10ms [F1DC101P-SR] Rising 1.3ms, Falling 3.7ms [F1DC102P-SR] Keyboard Type Laptop style Keyboard Connection PS/2 Mouse Type Touchpad style Mouse Connection PS/2 Operating Life of Individual Keys 8 million cycles Key-Locking Mechanism Controls 105-Key Active-Matrix Color Panel Auto Left Right adjust/return Rail-Release Button Keyboard (PS/2) TFT/LCD LCD Front-Panel Touch Pad (PS/2) Fold-Down Handle On/off switch Green/amber Up Down Menu/select LED status light Specifications Installation Step 1: Place the console inside the rack. Step 2: Mount the front brackets to the rack. Step 3: Connect the rear brackets to the Console with the provided screws. Step 4: Adjust the length of the rack-mount brackets. Installation Step 5: Lock the adjustable brackets by tightening the rear screws. Step 6: Connect the IEC power cable to an active power outlet and power up the Console. ...... Installation Connecting the KVM Switch or Server Step 1 Make sure your KVM switch or server is powered OFF. Step 2 Using the included PS/2 KVM Cable Kit, connect one set of VGA and PS/2 connectors to the back of the Console. (Refer to diagrams below.) Step 3 Connect the other end of the Cable Kit to the console monitor, keyboard, and mouse ports on your KVM switch or server. (Refer to diagrams below.) Step 4 Power ON the Console. Step 5 Power ON the KVM switch or server connected to the Console. Step 2 Step 3 Connecting to a KVM switch Connecting to a server Console Console .............................................................................. KVM Switch ...... Server Connecting the KVM...
Эта инструкция также подходит к моделям:Мониторы - F1DC10XP-SR (575.19 kb)
Мониторы - F1DC100P-SR (575.19 kb)
Мониторы - F1DC101P-SR (575.19 kb)