Войти:
Оценок - 4, средний балл: 3.8 ( )

Инструкция по эксплуатации Patton electronic, модель SMARTNODE 4520

Производитель: Patton electronic
Размер: 2.93 mb
Название файла: SN4520-4110.pdf
Язык инструкции:en
Перейти к скачиванию



Фрагмент инструкции


Ensure that your site is properly prepared before beginning installation. Before installing the gateway router device, the following tasks should be completed: •Create a network diagram (see section “Network information” on page 30) •Gather IP related information (see section “IP related information” on page 30 for more information) •Install the hardware and software needed to configure the SmartNode. (See section “Software tools” on page 30) •Verify power source reliability (see section “Power source” on page 30). When you finish preparing for gateway router installation, go to section “Installing the gateway router” on page 31 to install the device. Installation checklist The installation checklist (see table 4) lists the tasks for installing a SmartNode 4520 or 4110 Series router. Make a copy of this checklist and mark the entries as you complete each task. For each SmartNode 4520 or 4110 Series router, include a copy of the completed checklist in your site log. Table 4. Installation checklist Task Verified by Date Network information available & recorded in site log Environmental specifications verified Site power voltages verified Installation site pre-power check completed Required tools available Additional equipment available All printed documents available SmartWare release & build number verified Rack, desktop, or wall mounting of chassis completed Initial electrical connections established ASCII terminal attached to console port Cable length limits verified Initial configuration performed Initial operation verified Site log Patton recommends that you maintain a site log to record all actions relevant to the system, if you do not already keep such a log. Site log entries should include information such as listed in table 5. Table 5. Sample site log entries Entry Description Installation Make a copy of the installation checklist and insert it into the site log Upgrades and maintenance Use the site log to record ongoing maintenance and expansion history Configuration changes Record all changes and the reasons for them Maintenance Schedules, requirements, and procedures performed Comments Notes, and problems Software Changes and updates to SmartWare software Network information Network connection considerations that you should take into account for planning are provided for several types of network interfaces are described in the following sections. Network Diagram Draw a network overview diagram that displays all neighboring IP nodes, connected elements and telephony components. IP related information Before you can set up the basic IP connectivity for your SmartNode 4000 series you should have the following information: •IP addresses used for Ethernet LAN and WAN ports •Subnet mask used for Ethernet LAN and WAN ports •IP addresses of central H.323 Gatekeeper (if used) •IP addresses of central PSTN Gateway for H.323 and/or ISoIP based calls •IP addresses of central TFTP Server used for configuration upload and download Software tools You will need a PC (or equivalent) with a VT-100 emulation program (e.g. HyperTerminal) to configure the software on your SmartNode router. Power source If you suspect that your AC power is not reliable, for example if room lights flicker often or there is machinery with large motors nearby, have a qualified professional test the power. Install a power conditioner if necessary. Location and mounting requirements The SmartNode router is intended to be placed on a desktop or similar sturdy, flat surface that offers easy access to the cables. Allow sufficient space at the rear of the chassis for cable connections. Additionally, you should consider the need to access the unit for future upgrades and maintenance. Installing the gateway router SmartNode gateway router installation consists of the following: •Placing the device at the desired installation location (see section “Mounting the gateway router” on page 31) •Installing the interface and power cables (see section “Connecting cables” on page 31) When you finish installing the SmartNode, go to chapter 4, “Getting started with the SmartNode” on page 38. Mounting the gateway router Place the router on a desktop or similar sturdy, flat surface that offers easy access to the cables. The router should be installed in a dry environment with sufficient space to allow air circulation for cooling. NoteFor proper ventilation, leave at least 2 inches (5 cm) to the left, right, front, and rear of the SmartNode gateway router. Connecting cables WARNING Do not work on the system or connect or disconnect cables during periods of lightning activity. CAUTION The Interconnecting cables shall be acceptable for external use and shall be rated for the proper application with respect to voltage, current, anticipated temperature, flammability, and mechanical serviceability. Installing router cables takes place in the following order: 1.Installing the RJ-11 voice port (FXS) cable or cables (see “Installing an interface cable on the router’s F...

Эта инструкция также подходит к моделям:
Кромочные фрезеры - SMARTNODE 4110 (2.93 mb)

Напишите ваш отзыв об устройстве



Текст отзыва
Ваше имя:
Введите две цифры:
capcha





Категории