Войти:
Оценок - 4, средний балл: 3.8 ( )

Инструкция по эксплуатации Bunn, модель DUAL SH DBC DUAL068000

Производитель: Bunn
Размер: 663.19 kb
Название файла: 29877.0003.pdf
Язык инструкции:en
Перейти к скачиванию



Фрагмент инструкции


NOTE – Bunn-O-Matic recommends 1.4" copper tubing for installations of less than 25 feet and 3.8" for more than 25 feet from the 1.2" water supply line. A tight coil of copper tubing in the water line will facilitate moving the brewer to clean the counter top. Bunn-O-Matic does not recommend the use of a saddle valve to install the brewer. The size and shape of the hole made in the supply line by this type of device may restrict water flow. This equipment must be installed to comply with the International Plumbing Code of the International Code Council and the Food Code Manual of the Food and Drug Administration (FDA). For models installed outside the U.S.A., you must comply with the applicable Plumbing/Sanitation Code for your area. PLUMBING HOOK-UP NOTE - If a backflow preventer is required by code, a shock arrestor should be installed between backflow preventer and dispenser. Installing the shock arrestor as close to dispenser as possible will provide best results. 1. Flush the water line and securely attach it to the flare fitting located on bottom of brewer. 2. Turn on the water supply. 29877-3 043009 OPERATING CONTROLS f e j g MAIN ON/OFFSWITCH b b a d d c h h c OPERATING CONTROLS (a) MAIN ON/OFF SWITCH This switch, located under the brewer behind the right front leg, turns power on and off to all components in the brewer. (b) BATCH SELECTOR SWITCHES Pressing the switch corresponding to the Small, Medium, or Large batch selects the amount of coffee to be brewed. Pressing a different switch after a brew cycle has been initiated does not change the brew batch in progress. Light indicates the selected batch to brew. (c) ON/OFF SWITCH (ENABLE BREW) Pressing the ON/OFF switch alternately turns the brewing side on and off. Pressing this switch during the brew cycle will interrupt the brew cycle, stopping the flow of water. Pressing this switch during the programming of the brewer will exit the setup and return to the main screen. (d) BREW SWITCH Momentarily pressing and releasing this switch begins a brew cycle. (e) PROGRAM SWITCH Pressing and holding the upper right hidden switch allows entry to the programming menus. Pressing and releasing the switch steps through each function screen during programming. (f) FUNCTION SCREEN This is the display which shows the various functions of the brewer and allows the programming to be accomplished. (g) FUNCTION SCREEN SWITCHES These are the hidden switches which are used to program the brewer. (h) FUNNEL SENSING COILS These are used to "receive" information from the Smart Funnel handle (coffee name and batch size), and also from RECIPE CARDS. (j) SCROLL BACKWARDS The upper left hidden switch can be used to scroll backwards through the function list. 29877-3 051007 INITIAL SETUP CAUTION: The brewer must be disconnected from the power source throughout the initial setup, except when specified in the instructions. 1. Insert an empty funnel into the funnel rails of one of the brew stations. 2. Place an empty server under the funnel. 3. Connect the brewer to the power source. Water will begin flowing into the tank and stop when the tank is filled to its capacity. Display will show PLEASE WAIT...TANK FILLING until tank is filled with water. 4. Wait approximately twenty minutes for the water in the tank to heat to the proper temperature. Display will show READY TO BREW...WATER TEMP: XXX. when tank is at operating temperature. 5. Place a small vessel beneath the faucet and open the faucet handle. Release it when you hear the tank refilling. 6. Water volumes have been preset at the factory. Refer to adjustments for the Set Brew Volumes section of this manual should the volume need to be increased or decreased. 7. The brewer is now ready for use in accordance with the coffee brewing instructions. COFFEE BREWING 1. Insert a BUNN filter into the Smart Funnel. 2. If a grinder is not used to obtain the coffee grounds, pour the proper amount of fresh coffee grounds into the funnel and level by gently shaking. Slide the funnel into the funnel rails and select batch size. Proceed to step 5. 3. If a G9-2T DBC or MHG grinder is used with a compatible Smart Funnel, select the desired batch size on the grinder. Grind the selected amount of fresh coffee into funnel and level grounds by gently shaking. It is not necessary to select a size on the brewer. 4. Slide the funnel into the funnel rails. The brewer will read the size ground through the chip in the funnel handle and will automatically select the correct size to brew. 5. Place an empty server under the funnel. 6. The ENABLE BREW switch must be ON. Momentarily press and release the "BREW" switch. If the brewer has the funnel lock option and if it is activated, once a brew cycle has been started the funnel is locked in place. There may be certain situations in which the brew cycle will not begin when the brew switch is pressed: a) BREW TEMPERATURE TOO LOW - wait until heated or cancel BREW LOCKOUT option. b) FUNNEL NOT IN PLACE (or usi...


Напишите ваш отзыв об устройстве



Текст отзыва
Ваше имя:
Введите две цифры:
capcha





Категории