|
Фрагмент инструкции
• A piezo ignitor and ceramic electrode create spark to ignite the pilot light. It does not require any matches, batteries or any other sources of ignition to light the pilot. • Each time you turn on your fireplace, you may notice some amount of condensation on the inside of the fireplace glass. This is normal and will disappear after 10-20 minutes of operation. • Your direct-vent gas fireplace system (fireplace and venting) is a balanced and sealed gas operating unit. It requires approximately 10-20 minutes of operating time before the flame pattern stabilizes. PRE-INSTALLATION PREPARATION LOCATION AND SPACE REQUIREMENTS Determine the safest and most efficient location for your DESA direct-vent fireplace. Make sure that rafters and wall studs are not in the way of the venting system. Choose a location where the heat output is not affected by drafts, air conditioning ducts, windows or doors. Figure 2 shows some common locations. Be aware of all restrictions and precautions before deciding the exact location for your fireplace and termination cap. When deciding the location of your fireplace, follow these rules: • Do not connect this fireplace venting to a chimney flue serving a separate solid-fuel burning fireplace or appliance. • Due to high temperatures, do not locate this fireplace in high traffic areas, windy or drafty areas, or near furniture or draperies. • Proper clearances must be maintained. • If your fireplace is to be installed directly on carpeting, vinyl tile, or any combustible material other than wood, it must be installed on a metal or wood panel extending the full width and depth of the fireplace. See Figure 3. • Your fireplace is designed to be used in zero clearance installations. Wall or framing material can be placed directly against any exterior surface on the back, sides, or top of your fireplace, except where standoff spacers are integrally attached. If standoff spacers are attached to your fireplace, these spacers can be placed directly against wall or framing material. See framing details on page 5. • If you plan on installing a television or entertainment center recessed above your fireplace, it is recommended that you maintain a minimum 18" above top of louver opening. • When locating termination cap, it is important to observe the minimum clearances shown in Figure 7, page 6. • If recessing into a wall, you can avoid extra framing by positioning your fireplace against an already existing framing member. • Do not recess termination cap into a wall or siding. • You may paint the termination cap with 450.F (232.C) heat- resistant paint to coordinate with the exterior finish. • There must not be any obstruction such as bushes, garden sheds, fences, decks, or utility buildings within 24" from the front of the termination cap. • Do not locate termination cap where excessive snow or ice build up may occur. Be sure to clear vent termination area after snow falls to prevent accidental blockage of venting system. When using snow blowers, do not direct snow towards vent termination area. Figure 2 - Common Fireplace Locations Flush with a wall Through exterior wall enclosed in a chase Corner installation 23 1/4" 48" 36 1/4" Figure 3 - Fireplace Bottom Dimensions For more information, visit more information, visit 111922-01A PRE-INSTALLATION PREPARATION Clearances Framing and Finishing 5 PRE-INSTALLATION PREPARATION Continued CLEARANCES Minimum clearances to combustibles for the fireplace are as follows: Back, and sides 0"/mm Perpendicular walls 6" (152mm) Floor 0"/mm Ceiling to louver opening 42" (1067mm) Front 36" (914mm) Top 0"/mm Vent (See venting instructions for specific venting clearances.) Combustible material with a maximum thickness of 5/8" may be flush with the top front of fireplace . NOTICE: This fireplace is intended for use as supplemental heat. Use this fireplace along with your primary heating system. Do not install this fireplace as your primary heat source. If you have a central heating system, you may run system’s circulating blower while using fireplace. This will help circulate the heat throughout the house. In the event of a power outage, you can use this fireplace as a heat source. FRAMING AND FINISHING Figure 4 shows typical framing of this fireplace. Figure 5 shows framing for corner installation. All minimum clearances must be met. For available accessories for this fireplace, see Accessories on page 34. If you are using a separate combustible mantel piece, refer to Figure 6 for proper installation height. You can install noncombustible mantels at any height above the fireplace. Note: Noncombustible mantels may discolor! 40 1/8" 48 1/4" 25 5/8" C B A D E F G Top of Louver Opening 3 2 1 4 5 6 7 Wall Figure 5 - Framing Clearances for Corner Installation Figure 6 - Clearances for Combustible Mantels Nailing Tabs 41 5/8" 21 5/8" 58 1/2"13 1/2" 16 3/4" 48" 48 1/4" 81 1/2" Ref. Mantel Depth Ref. Mantel from Top of Louver Opening 1 14"...
Эта инструкция также подходит к моделям:Камины - (V)K42EN (2.54 mb)