|
Фрагмент инструкции
Coupling Assembly with Lock Reflector End Cap Punch out center section to accommodate tube. Tube and Reflector Hanger Suspend system from these hangers. Flex Gas Line with Shut Off Cock Tube Hot Rolled or Heat Treated Aluminized Tube Supplied in 10' (3 m) lengths. Burner Tube Supplied in 10' (3 m) lengths. Burner tube is always the first tube after the burner. Reflector Support Strap & Wire Form Turbulator Turbulator must be installed in the last standard section of tube. Turbulator is not required on the TF-250/ 300/350/380. For installation see Page 21, Section 7.5. Flexible Boot Flexible boot is used to connect the last tube to the vent. Vent Sleeve Vent Sleeve installed inside flexible boot. SECTION 5: MAJOR COMPONENTS 5.1 Standard Parts List Table 1: Contents of Burner Carton Part No. Description TF-120 TF-160 TF-200 TF-250 TF-300 TF-350 TF-380 090XXXXX Burner Assembly (Rate and Fuel Varies) 1 1 1 1 1 1 1 02568200 Gasket (Burner to Burner Tube) 1 1 1 1 1 1 1 190100NA Installation, Operation and Service Manual 1 1 1 1 1 1 1 94273914 Hex Head Bolts 5/16-18 Rolok 8 8 8 8 8 8 8 96411600 Split Lock washer 8 8 8 8 8 8 8 *91412203 Flexible Stainless Steel Gas Hose - 3/4" NPT (US Models Only) 1 1 1 1 1 1 1 03051503 Turbulator Adapter 2 2 2 ---- 03051504 Turbulator 2.5' (76 cm) Aluminized Steel 8 8 4 ---- 91412800 Flexible Boot 2 2 2 2 2 2 2 91901300 Boot Clamp 4 4 4 4 4 4 4 09080000 Vent Sleeve 2 2 2 2 2 2 2 *Canadian Models: Rubber (Type 1) Gas Hoses available as an accessory. See Page 40, Section 10. Table 2: Contents of Core and Extension Packages Core Packages Extension Packages Hot Rolled with Aluminum Reflector Aluminized with Aluminum Reflector Aluminized with Stainless Steel Reflector Hot Rolled with Aluminum Reflector Aluminized with Aluminum Reflector Aluminized with Stainless Steel Reflector Part No. Description 20' (6m) 30' (9m) 40' (12m) 20' (6m) 30' (9m) 40' (12m) 20' (6m) 30' (9m) 40' (12m) 10' (3m) 20' (6m) 30' (9m) 40' (12m 10' (3m) 20' (6m) 30' (9m) 40' (12m 10' (3m) 20' (6m) 30' (9m) 40' (12m 91409300 Tube, Hot Rolled Steel, 10' (3m) 1 2 3 ------1 2 3 4 -------- 91409408 Tube, HT Aluminized, 10' (3m) ---1 2 3 1 2 3 ----1 2 3 4 1 2 3 4 03051101 Burner Tube, ALUMI-THERM® Steel, 10' (3m) -1 1 -1 1 -1 1 ------------ 03051601 Burner Tube, HT ALUMI-THERM® Steel, 10' (3m) 1 --1 --1 -------------- 01312700 Coupling Assembly 1 2 3 1 2 3 1 2 3 1 2 3 4 1 2 3 4 1 2 3 4 02750303 Standard Reflector, 8' (3.5m) 3 4 6 3 4 6 ---2 3 4 6 2 3 4 6 ---- 02750800 End Cap 2 2 2 2 2 2 --------------- 027503SS Stainless Steel Reflector, 8’ (3.5m) ------3 4 6 --------2 3 4 6 027508SS Stainless Steel End Cap ------2 2 2 ------------ 03090100 Tube and Reflector Hanger 3 4 5 3 4 5 3 4 5 1 2 3 4 1 2 3 4 1 2 3 4 91907302 S-Hook 6 8 10 6 8 10 6 8 10 2 4 6 8 2 4 6 8 2 4 6 8 03050010 Reflector Support Package (Strap, Wire Form, Screws) 2 3 5 2 3 5 4 5 7 2 3 4 6 2 3 4 6 2 3 4 6 91107720 U-Clip Package 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 90502700 Vent Adapter (Not required for TF Models) 1 1 1 1 1 1 1 1 1 ------------ 01318901 Tube Clamp Package 1 1 1 1 1 1 2 2 2 ------------ Part Number CP20HRSCP30HRSCP40HRSCP20ALUMCP30ALUMCP40ALUMCP20ALUMSSCP30ALUMSSCP40ALUMSSEXP10HRSEXP20HRSEXP30HRSEXP40HRSEXP10ALUMEXP20ALUMEXP30ALUMEXP40ALUMEXP10ALUMSSEXP20ALUMSSEXP30ALUMSSEXP40ALUMSS TF-SERIES INSTALLATION, OPERATION AND SERVICE MANUAL Table 3: Component Package Guide Tubing Length Each Side Core Packages (2 Required) Model Minimum Hot Rolled with Aluminum Reflector Aluminized with Aluminum Reflector Aluminized with Stainless Steel Reflector TF-120 20' (6 m) CP20HRS CP20ALUM CP20ALUMSS TF-160 20' (6 m) 30' (9 m) CP20HRS CP30HRS CP20ALUM CP30ALUM CP20ALUMSS CP30ALUMSSTF-200 TF-250 40' (12 m) CP40HRS CP40ALUM CP40ALUMSS TF-300 50' (15 m) CP30HRS + EXP20HRS CP30ALUM + EXP20ALUM CP30ALUMSS + EXP20ALUMSS TF-350 50' (15 m) CP30HRS + EXP20HRS CP30ALUM + EXP20ALUM CP30ALUMSS + EXP20ALUMSS TF-380 60' (18 m) CP30HRS + EXP30HRS CP30ALUM + EXP30ALUM CP30ALUMSS + EXP30ALUMSS Additional tubing length may be added to heater. Tubing must be heat-treated, aluminized or porcelain coated. Any additional tubing lengths are considered as vent length for length determination. Maximum venting length for minimum heater length is 45' (13.7 m), or 22.5' (7 m) on each tube. SECTION 6: SUGGESTED LAYOUTS SECTION 6: SUGGESTED LAYOUTS The following are suggested layouts for the heater. These layouts are effective in maximizing the heat pattern and overall performance of the heater. All heaters can be common vented or individually vented (See Page 34, Section 9) depending on the building requirements. These are only suggested layouts. The heater can be designed in various configurations provided they are in the guidelines of this manual. When designing a U-Tube or Elbow configuration, the following rules must be adhered to: • A minimum of 10' (3 m) of tubing on TF-120/160 and/or a minimum of 15' (4.5 m) of tubing on the TF-200/250/300/350/380 is required between the...
Эта инструкция также подходит к моделям:Электрообогреватели - Vantage TF TF-120 (5.17 mb)
Электрообогреватели - Vantage TF TF-160 (5.17 mb)
Электрообогреватели - Vantage TF TF-250 (5.17 mb)
Электрообогреватели - Vantage TF TF-300 (5.17 mb)