Войти:
Оценок - 0, средний балл: 0 ( )

Инструкция по эксплуатации Bosch, модель AH600190/02

Производитель: Bosch
Размер: 1.05 mb
Название файла:
Язык инструкции:en
Перейти к скачиванию



К этому устройству также есть другие инструкции:

Фрагмент инструкции


If required, a side outlet for the air duct is available at an extra charge. The socket must be place behind the duct cover on the wall. recommend the use of our telescopic wall box TM 150-045 (O 150). 260 Sus min. 60015 0 480 over electric cooker Exhaust air: min. 670 750 - 1400 Air recirculation: 825 - 1400 1600 Hood height Exhaust air: 2.35 - 3.0 Air recirculation: 2.43 Ceiling height Note: pensio 522.5 To prevent the ingress of water, e.g. condensate or rain water from an uncovered exhaust air shaft, our condensate separator RV 060-150 must be installed in the exhaust air line. The condensate separator 520 must still be acciessible after installation. Air recirculation You need the following accessories to install the air recirculation hood: – KF 600-090: activated charcoal filter: Depending on the ceiling height, the following duct units are at your disposal for air recirculation: – LK 600-110: Ventilation duct for a ceiling height Fig. 17 of 2.39 - 2.60 m – LK 600-120: Ventilation duct for a ceiling height of 2.61 - 3.00 m The dimensions above refer to a distance of 1.60 m from the floor to the bottom edge of the hood. Proceed as follows: Exhaust air operation: – From the bottom edge of the hood, mark a center line on the wall. – With the aid of the drilling template, mark the positions of the screws on the wall. Mark the contour of the hook-in area. This will make it easier to hook in the hood (Fig. 18). – Pay attention to the minimum clearance of 600 mm for electric cookers and 670 mm for gas cookers. The bottom edge of the template corresponds to the bottom from edge of the hood. – Using the drilling template, drill the 6 holes for the hood (area I of the drilling template) and the two holes for suspending the chimney (area II of the drilling template). In the top two securing holes for the hood, fix the two hooks e with the countersunk screws d. Make sure that the hooks lie flatly on the wall. In certain circumstances you may have to countersink the drill holes. Fit the included dowels a in the other drill holes. Note: Pay attention to any special accessories that you may have to fit. – Screw on the retaining bracket for the chimney paneling. – Detach the grease filters. – Unscrew the two black plates on the left and right of the chimney. – Hang the hood on the two hooks. Adjust the suspended element with the recessed head screw and align the hood using a spirit level (Fig. 19). 14 448 137 625 270 300 15 310 mind. 600 Elektro mind. 670 Gas 230 Fig. 18 Fig. 19 min. 600 electric min. 670 gas Important: Before marking the securing holes, make sure that no electricity or water lines or other lines are laid at the drilling points in the wall. – Secure the hood to the wall using the 4 screws b with shims c (Fig. 20). – Establish the pipe connection. – Establish the electrical connection. – Extract the protective file from the chimney paneling. Note: Avoid damaging the sensitive stainless steel surfaces. – Join the chimney shoe with the chimney base using the 6 screws (3.5 x 9.5 mm) (Fig. 21). – Fit the top of the chimney into the base. Make sure that the fastening holes on the side are at the top. – Secure the top duct unit with 2 screws on the ceiling holder. – Pull the shoe down into its final position (Fig. 22). Note: Avoid scratches when fitting the elements into one another by placing the assembly template, for example, over the edge of the bottom chimney paneling to protect it. – Reinsert the grease filters. – Again screw in the two black plates on the left and right of the chimney. – Place the glass plates on the black plates. 15 Fig. 20 Fig. 21 Fig. 22 Recirculation air operation – From the bottom edge of the hood, mark a center line on the wall. – With the aid of the drilling template, mark the positions of the screws on the wall. Mark the contour of the hook-in area. This will make it easier to hook in the hood (Fig. 23). – Pay attention to the minimum clearance of 600 mm for electric cookers and 670 mm for gas cookers. The bottom edge of the template corresponds to the bottom from edge of the hood. – Using the drilling template, drill the 6 holes for the hood (area I of the drilling template) and the two holes for suspending the chimney (area II of the drilling template). In the top two securing holes for the hood, fix the two hooks e with the countersunk screws d. Make sure that the hooks lie flatly on the wall. In certain circumstances you may have to countersink the drill holes. Fit the included dowels a in the other drill holes. Note: Pay attention to any special accessories that you may have to fit. – Detach the grease filters. – Unscrew the two black plates on the left and right of the chimney. – Hang the hood on the two hooks. Adjust the suspended element with the recessed head screw and align the hood using a spirit level (Figure 19). – Secure the hood to the wall using the 4 screws b with shims c. – Screw the retaining bracket for the chimney paneling onto the wall together with the ...

Эта инструкция также подходит к моделям:
Вытяжки - AH600190/03 (1.05 mb)
Вытяжки - AH600190/04 (1.05 mb)

Напишите ваш отзыв об устройстве



Текст отзыва
Ваше имя:
Введите две цифры:
capcha





Категории