Ensure the vent and air piping and the combustion air supply comply with these instructions regarding vent system, air system, and combustion air quality. Inspect finished vent and air piping thoroughly to ensure all are airtight and comply with the instructions provided and with all requirements of applicable codes. Failure to provide a properly installed vent and air system may cause severe personal injury or death. Use only the material listed in Rinnai's vent documentation for vent pipe, and
10" / 250mm Installation & Servicing Instructions Rinnai E-Series 13 connection diameters table 2 boiler connections / mounting points figure 2 f w g k r c Connection for combustion air supply and vent system f w g k r c Boiler type E75CN E110CN E75CP E110CP Vent system / Combustion air supply 80/125mm 80/125mm Gas pipe - g 3/4"M-NPT 3/4"M-NPT Supply pipe - f 0.87" x 3/4"M-NPT / 22mm G3/4"x 3/4"M-NPT Return pipe - r 0.87" x 3/4"M-NPT / 22mm G3/4"x 3/4"M-NPT Condensate pipe - c 0.87" / 22mm 0.87"
The program takes 17 minutes and stops automatically. After this the unit will function normally. (See also 'Filling and de-aerate the boiler and installation, chapter 9). On a call for heating or hot water the control system will select the required water control temperature. This water temperature is called the T-set value. On a call for central heating the boiler ignites first at low input. The input is then changed slowly to match the load required. The boiler operates in this way to avoid e
Refer to this manual. For assistance or additional information consult a qualified installer or the gas supplier. CAUTION! The user manual is part of the documentation that is delivered to the installation's operator. Go through the information in this manual with the owner/operator and make sure that he or she is familair with all necessary operating instructions. NOTICE! Installation and service must be performed by a qualified installer, service technician or the gas supplier. In the Commonwe
First check the identification plate on the boiler for the suitable gas type. Do not use the boiler for another type of gas than indicated on the identification plate of the boiler. This will cause improper functioning and can damage the boiler. Natural gas: resume with chapter 6.4.1 Propane gas: resume with chapter 6.4.2 Installation ii 6.4.1. Gas connection with natural gas Sediment trap figure 7 i! ii The gas supply connection must comply with local regulations or, if such NOTICE regulations
Use of non-Rinnai parts will result in the void of warranty. 8 9 Condensate tray figure 31 11 12 13 14 !DANGER Installation Visual inspection of the flame Inspection glass figure 33 The burner must flame evenly over the entire surface when operating correctly. The flame must burn with a clear, blue, stable flame. Check the flame through the inspection glass in the ignition probe (fig. 33). The flame pattern should be as shown in the figures below. SATISFACTORY Ignition probe blue flame UNSATISFA
Thisdrawing is not intended to describe a complete system. It is up to thecontractor or engineer to determine the necessary components andconfiguration of the particular system to be installed. The drawing doesnot imply compliance with local building code requirements. It is theresponsibility of the engineer or contractor to ensure that the installation isin accordance with all local building codes. Confer with local buildingofficials before installation. 3 BC 120VLow voltage Q Series boilers2 b
Q Series Boiler ............. DHW from Indirect Tank ...................................6 QPD-09-0003 Rev B ........... Q Series Boiler ............. Single Zone Priority DHW.................................7 QPD-09-0004 Rev B ........... Q Series Boiler.............. 4 Zone Valve with DHW ...................................8 QPA-09-0001 Rev C ........... Q Series Boiler.............. 3 On-Off High Temperature Zones...................9 QPA-09-0002 Rev B............ Q Series Boiler..............
The drawing doesnot imply compliance with local building code requirements. It is theresponsibility of the engineer or contractor to ensure that the installation isin accordance with all local building codes. Confer with local buildingofficials before installation. 3 BC 120VLow voltage Q Series boilers2 boilers with DHW indirect tank123456910111213141516171819202122262DonotapplypowertN1/ tN2Com10KUnOSwComOutBoilDHW10A10AStageStage112210A10APowerNLP1BoilDHWPmp/ VlvBoilerDemandDemComDHWDemSetpDem8
Thisdrawing is not intended to describe a complete system. It is up to thecontractor or engineer to determine the necessary components andconfiguration of the particular system to be installed. The drawing doesnot imply compliance with local building code requirements. It is theresponsibility of the engineer or contractor to ensure that the installation isin accordance with all local building codes. Confer with local buildingofficials before installation. 3 BC 53H 4 N/ O 4 N/ C 6N/ O N N/ C 6 12