Войти:
Оценок - 3, средний балл: 4.7 ( )

Инструкция по эксплуатации Kobe Range Hoods, модель CH7736SQ

Производитель: Kobe Range Hoods
Размер: 1.07 mb
Название файла:
Язык инструкции:en
Перейти к скачиванию



Фрагмент инструкции


IF YOU ARE UNFAMILIAR WITH METHODS OF INSTALLING ELECTRICAL WIRING, SECURE THE SERVICES OF A QUALIFIED ELECTRICIAN. CAUTION: TO REDUCE THE RISK OF FIRE AND ELECTRIC SHOCK, DO NOT USE WITH ANY SOLID-STATE SPEED CONTROL DEVICE. 5 - INSTALLING THE RANGE HOOD - (Keep all packing materials for return or exchange) Temporarily wire the hood to test for proper operation before installing. Before installing, please peel protective film off the hood first, if any. NOTE: The recommended distance from range hood bottom to top of the cooking surface is between 28” ~ 30”. {Fig. 1a} {Fig. 1b} {Fig. 1c} WARNING: As the hood is heavy, we strongly recommend using all 8 mount ing holes to install the hood. Installation may require more than 1 person. For Mounting on a Cabinet with a Flush Bottom 1) If you need to move the cooking range to work on the cabinet, turn off the power for an electric range at the main electrical box. SHUT OFF THE GAS BEFORE MOVING A GAS RANGE. 2) To make an electrical line access opening, please refer to section Electrical Power Line Access. 3) Use 1” wood screws for mounting the hood. Puncture the eight indented mounting holes. Measure & create access opening for electrical wires under the cabinet. 4) a) For top venting: Cut rectangle opening required for 6”, 7” or 3.” X 10” duct. Remove temporary plastic vent cover on the top of the hood. Replace with the plastic multi duct exhaust vent piece that came with the hood. Cut along the indented outline for the size of the duct opening that you need. {Fig. 2} Fasten plastic multi duct exhaust vent piece with the raised surface facing outward back onto the top of the hood. (See Fig 2) 7” 6” {Fig. 2} Multi Duct Exhaust Base (included) (Remove) Temporary vent cover 6 b) For rear venting: Unscrew the rectangular plastic vent portion at the back of the hood. {Fig.4} Turn the vent piece over so that the flat surface is facing you. Cut along the indented outline until there is a 3.” X 10” opening. Fasten plastic vent piece with the raised surface facing outward back onto the hood. {Fig.4} {Fig.5} {Fig.6} ( Rear Venting ) 5) Remove bottom panel & carefully place aside. 6) Take the hood, place electrical power line through access opening {Fig. 1b}, and use eight 1” wood screws for mounting the hood. {Fig.1e}. CAUTION: MAKE SURE THE HOOD IS SECURE BEFORE RELEASING. 7) Replace bottom casing. 8) Slide each oval oil container into the oil container slots at the back of the safety screen. {Fig.5} 9) Finally, place a round oil container with the three prongs into the larger holes in the specially made openings in the center of the screen & turn clockwise until it snaps into place. Do the same for the other round oil container. {Fig.6} For Mounting on a Cabinet with a Recessed Bottom 1) If you need to move the cooking range to work on the cabinet, turn off the power for an electric range at the main electrical box. SHUT OFF THE GAS BEFORE MOVING A GAS RANGE. 2) Measure the space (under the cabinet) between the inside front edge and inside back edge {Fig. 3}. With a saber saw, cut wood filler strips (not included) to fill in the bottom of the cabinet. Use 2-1/4” long wood screws (not included) to attach wood strips to the cabinet. Make sure you have wood filler strips for all eight mounting holes. For metal cabinet, use 3/8” x 2-1/2” bolts and nuts to secure the strips to the cabinet. The hood will mount on these filler strips. (For a more secure installation, you can also use screws from inside the cabinet down into the wood filler strips.) Make sure the filler strips do not cover the electrical power line access opening. {Fig. 3} 7 3) Follow installation instructions from the section For Mounting on a Cabinet with a Flush Bottom. Making The Electrical Connection (SHOULD BE DONE BY A LICENSED PROFESSIONAL) ----SAFETY WARNING---- INTERIOR OF HOOD MAY HAVE VERY SHARP EDGES, PLEASE WEAR PROTECTIVE GLOVES IF YOU HAVE TO OPEN THE HOOD FOR CLEANING OR SERVICING. CAUTION: MAKE SURE ELECTRICAL POWER IS TURNED OFF BEFORE STARTING THIS SECTION. 1) After turning off the electrical power at the main power source, push the electrical power line through the access opening drilled earlier in the wall or bottom of the cabinet. There are three different color wire strands to be connected. Strip solid wire 5/16” and strip stranded wire 3/8”. 2) Connect the power line wire to the grounding green lead supplied with the hood. 3) Make the electrical connections by fastening the black power wire to the black wire and the white power wire to the white wire located in the electrical wiring compartment. Align any frayed strands or conductors. Screw on conductors; push wires firmly into connectors when starting. Stop when the bottom of the connector reaches conductor. Follow all codes. 4) Plug into electrical outlet. Turn on power and check operation of fans and light. {Fig.7} Congratulations, your KOBE range hood is ready to use! White Wire (Neutral) Black Wire (Power) Green Wire (Ground) 8 - O...

Эта инструкция также подходит к моделям:
Вентиляторы - CH7730SQ (1.07 mb)
Вентиляторы - CH7742SQ (1.07 mb)
Вентиляторы - CH7748SQ (1.07 mb)

Напишите ваш отзыв об устройстве



Текст отзыва
Ваше имя:
Введите две цифры:
capcha





Категории