Войти:
Оценок - 2, средний балл: 4 ( )

Инструкция по эксплуатации Kobe Range Hoods, модель CH7748SQB

Производитель: Kobe Range Hoods
Размер: 1.86 mb
Название файла:
Язык инструкции:enesfr
Перейти к скачиванию



Фрагмент инструкции


Use duct tape to make all joints secure and air tight. 7. Continued on page 16. 7 UNDER THE CABINET INSTALLATION – REAR VENT Preparation before installation NOTE: TO AVOID DAMAGE TO YOUR HOOD, PREVENT DEBRIS FROM ENTERING THE VENT OPENING. - Decide the location of the venting pipe from the hood to the outside. Refer to Figure 6. - A straight, short venting run will allow the hood to perform more efficiently. - Try to avoid as many transitions, elbows, and long run as possible. This may reduce the performance of the hood. - Temporarily wire the hood to test for proper operation before installing. - Peel protective film off the hood (if any). - For installing under the cabinet with recessed bottom, attach 4-inch wide wood filler strips (not included) on each side. Refer to Figure 7. - Measure and create access opening for electrical wires under the cabinet or access opening for the electrical wires at the rear of the hood. - Remove the screws on the vent cover (rear) and cut along the line of the inner vent cover (rear) opening. Refer to Figure 8. - Cut the vent cover (rear) opening and reverse to the other side. Refer to Figure 9. Reattach the vent cover (rear). Figure 6 Figure 7 Inner Vent Reversed Cover (Rear) Vent Cover (Rear) Figure 8 Figure 9 8 Hood Installation CAUTION: If required to move the cooking range to install the hood, turn off the power on an electric range at the main electrical box. SHUT OFF THE GAS BEFORE MOVING A GAS RANGE. 1. Puncture the knockout holes on the hood as shown in Figure 10. 2. Unscrew and remove the multi duct exhaust. Replace with {F} vent cover (top) on page 3. Refer to Figure 11. Figure 10 Figure 11 3. Unscrew the six screws on the bottom casing. Remove the bottom casing or remove the baffle filters and spacers. If necessary, arrange the electrical wires to run through the 1” diameter hole on the top or the rear of the hood. Refer to Figure 12. 4. Using references on Table 1 and measurements on page 21 center the hood in place beneath the cabinet and flush with the front of the cabinet. 5. Place screw (not provided) into the exact center of each knockout hole. Make sure all screws are in place before tightening screws. CAUTION: MAKE SURE THE HOOD IS SECURE BEFORE RELEASING. 1” Diameter Hole Figure 12 Ductwork Installation 6. Use aluminum or steel pipe to connect the exhaust opening at the rear of the hood to the ductwork. Use duct tape to make all joints secure and air tight. 7. Continued on page 16. 9 WALL MOUNT INSTALLATION – TOP VENT ***This installation only applied with the purchase of a duct cover (Model No. CH1120DC). Preparation before Installation NOTE: TO AVOID DAMAGE TO YOUR HOOD, PREVENT DEBRIS FROM ENTERING THE VENT OPENING. - Decide the location of the venting pipe from the hood to the outside. Refer to Figure 13. - A straight, short venting run will allow the hood to perform more efficiently. - Try to avoid as many transitions, elbows, and long run as possible. This may reduce the performance of the hood. - Use duct tape to seal the joints between pipe sections. - If necessary, prepare back wall frame with cross framing lumber for secure installation. - Using references on Table 2 and measurements on page 21-22, decide the level of the lumber. Refer to Figure 14. Hood Preparation before Installation - Temporarily wire the hood to test for proper operation before installing. - Peel protective film off the hood and the duct cover (if any). - Cut the multi vent exhaust according to the size of the venting pipe. Refer to Figure 15. Figure 13 Figure 14 Figure 15 6" Round Vent 7" Round Vent 3-1/4" x 10" Vent 10 -If necessary, attach two rubber stands (provided) with two (4x8 mm) screws (provided) to the back of the hood. -Attach the hood-mounting bracket to the back of the hood with nine (3/16" x 3/8") screws (provided) as shown in Figure 16. Hood Installation CAUTION: If required to move the cooking range to install the hood, turn off the power on an electric range at the main electrical box. SHUT OFF THE GAS BEFORE MOVING A GAS RANGE. 1. Using references on Table 2 and measurements on page 21-22, mark the leveling point of the hood. Position two mounting screws (not provided) on the wall, leaving 1/8” away from the wall as shown in Figure 17. Mounting Screws Figure 16 Figure 17 2. Align hood-mounting bracket to the two screws on the wall and hook hood into place. Tighten screws to secure hood to the wall. CAUTION: MAKE SURE THE HOOD IS SECURE BEFORE RELEASING. Duct Cover Installation 3. Mark the position of the duct cover-mounting bracket. Use reference E from Table 2 and measurements on page 21-22. Attach and secure duct cover-mounting bracket with two screws (not provided). Refer to Figure 18. NOTE: Inner duct cover will cover the duct cover-mounting bracket. 4. Use aluminum or steel pipe to connect the plastic exhaust on the hood to the ductwork above. Use duct tape to make all joints secure and air tight. 5. Connect electrical wires. Refer to “Wiring to Po...

Эта инструкция также подходит к моделям:
Вентиляторы - CH7730SQB (1.86 mb)
Вентиляторы - CH7736SQB (1.86 mb)
Вентиляторы - CH7742SQB (1.86 mb)

Напишите ваш отзыв об устройстве



Текст отзыва
Ваше имя:
Введите две цифры:
capcha





Категории