Войти:
Оценок - 4, средний балл: 3.5 ( )

Инструкция по эксплуатации ParaBody, модель 445104

Производитель: ParaBody
Размер: 1.08 mb
Название файла: 3a1d92f4-6bcf-48d0-b854-d263d6df5db4.pdf
Язык инструкции:en
Перейти к скачиванию



Фрагмент инструкции


See FIGURE 6. • (NOTE: STEP 6 is only if the 435101 LEG PRESS OPTION is installed otherwise proceed to STEP 7.) • Assemble the previously removed ELASTIC CORD over the 2” PULLEY as shown in FIGURE 6. TOP BOOM 3/8” LOCK NUT 2” PULLEY 3/8” WASHER 3/8 X 1” 11 FIGURE 7 STEP 7 • LOOSELY assemble one 4-1/2” PULLEY (6) to the TOP BOOM using one 3/8 X 2-3/4” BOLT (13), two 3/8” FLANGE SPACERS (12), and one 3/8” LOCK NUT (19). See FIGURE 7. 6 12 12 19 13 3/8 X 2-3/4” TOP BOOM FIGURE 8 STEP 8 • Discard the two 3/8 X 1/2” SPACERS. • Remove two 2” PULLEYS (5) to the rear bracket on the TOP BOOM using one 3/8” THREADED SHAFT (9), two 3/8” WASHERS, two 3/8” HEX NUTS (8), and two 3/8” LOCK NUTS (7) as shown in FIGURE 8. FIGURE 9 STEP 9 • Position the elastic cords over the 2” PULLEYS as shown in FIGURE 9. • SECURELY assemble the two previously removed 2” PULLEYS, one previously removed 3/8” THREADED SHAFT, one previously removed 3-1/2” PULLEY, two previously removed 3/8” WASHERS, two previously removed 3/8” HEX NUTS, and two previously removed 3/8” LOCK NUTS to the rear bracket on the TOP BOOM as shown in FIGURE 9. 7 TOP BOOM 3/8” LOCK NUT 3/8” HEX NUT 3-1/2” PULLEY 2” PULLEY 3/8” WASHER 3/8” THREADED ROD TOP BOOM 3/8” LOCK NUT 3/8 X 1/2” SPACER 3/8” HEX NUT 2” PULLEY 3/8” WASHER 3/8” THREADED ROD ELASTIC CORD STEP 10 • Carefully remove and discard the PRESS CABLE as shown in FIGURE 10. PRESS CABLE (67249) FIGURE 10 8 0 1 2 3 4 5 6 1/2 1/2 1/2 1/2 1/2 1/2 9 STEP 11 • Route the new PRESS-STACK CABLE (5) around the pulleys and l-brackets as shown in STEP 11. (Remove pulleys for ease of installation.) 5 5 FIGURE 11 FIGURE 12 STEP 12 PRESS-STACK CABLE (67475) PRESS-STACK CABLE (67475) 5 PRESSSTACK CABLE (67475) • To assemble the PRESS-STACK CABLE (5) follow the cable routing as shown and use the following steps: • Screw the threaded end of the PRESS-STACK CABLE (5) approximately 1” into the end of the SELECTOR SHAFT of the HEAD PLATE on the WEIGHT STACK as shown in FIGURE 12. • Route the thread end of PRESS-STACK CABLE (5) up and over the PULLEY in the TOP BOOM above the WEIGHT STACK. (Remove pulley for ease of installation.) • SECURELY tighten the pulley connection from the previous step. FIGURE 14 STEP 14 • LOOSEN the bolts holding the TOP BOOM to the UPRIGHTS. Bolts will have to be removed to install GUIDE RODS (1). See FIGURE 14. 10 0 1 2 3 4 5 6 1/2 1/2 1/2 1/2 1/2 1/2 FIGURE 13 • Insert two WEIGHT PLATE BUSHINGS (17) into the top side of each of the fifteen WEIGHT PLATES (16) as shown in FIGURE 13. STEP 13 17 16 LOOSEN! TOP BOOM LOOSEN! FIGURE 15 STEP 15 • Insert two GUIDE RODS (1) into the BASE as shown on FIGURE 15. (NOTE: Lubricate GUIDE RODS (1) with silicon or teflon spray available at most hardware stores.) • Slide two 1-1/4 SQ. X 4-7/8” TUBES (3), two 3/4” WASHERS (15), and two WEIGHT STACK CUSHIONS (8) - IN THAT ORDER - down over the GUIDE RODS (1). • SECURELY assemble the WEIGHT STACK SHAFT (2) to the HEAD PLATE (4) using one 3/8 X 1-1/4” BOLT (14) and one 3/8” WASHER (10). • Using EXTREME CARE slide all fifteen WEIGHT PLATES (16) down over the GUIDE RODS (1) on to the WEIGHT STACK CUSHIONS (8). Make sure that the keyholes of the WEIGHT PLATES (16) are all facing the right way. (NOTE: If the359101 50 LB. ADD-KIT is purchased refer to the 359101 ASSEMBLY INSTRUCTIONS now.) • Insert four CAP PLUGS (9) into the top and bottom ends of the GUIDE RODS (1) as shown in FIGURE 15. • Slide the head plate assembly down over the GUIDE RODS (1) onto the weight stack. • Attach the WEIGHT STACK LABELS (18) to the weight stack. Also insert the WEIGHT STACK PIN (7) into the first WEIGHT PLATE (16) of the weight stack. 9 1 16 BASE 2 10 7 18 8 15 3 14 3/8 X 1-1/4” 4 11 9 STEP 16 FIGURE 16 12 • With the GUIDE RODS (1) securely held in the TOP BOOM. Tighten all TOP BOOM connections. (NOTE: Make sure the LAT CABLE runs over the top of the bolts in the TOP BOOM.) 0 1 2 3 4 5 6 1/2 1/2 1/2 1/2 1/2 1/2 TIGHTEN! (NOTE: Make sure LAT CABLE runs over top of bolts in TOP BOOM.) 1 TIGHTEN! TOP BOOM • CAREFULLY lift or tilt the TOP BOOM and insert all GUIDE RODS into the bushings. See FIGURE 16. 13 HEAD PLATE CABLE (67250) STEP 17 FIGURE 17 • Screw one of the threaded ends of the previously removed HEAD PLATE CABLE approximately 1” into the end of the WEIGHT STACK SHAFT. See FIGURE 17. WEIGHT STACK SHAFT STEP 18 • Screw the other threaded end of the HEAD PLATE CABLE approximately 1” into the end of the shaft on the D-RING. See FIGURE 18. FIGURE 18 • Route the thread end of HEAD PLATE CABLE up and over the PULLEYS in the TOP BOOM above the WEIGHT STACK. (Remove pulleys for ease of installation.) • SECURELY tighten the pulleys connection from the previous step. D-RING HEAD PLATE CABLE (67250) • Adjust out any slack in the two cable systems. (Refer to your 425104 instructions for the proper procedures.) FIGURE 19 REAR SHROUD FIGURE 19 REAR SHROUD STEP 19 • The rear SHROUD opening must be removed. Apply pressure to the bottom of the SHROUD where...


Напишите ваш отзыв об устройстве



Текст отзыва
Ваше имя:
Введите две цифры:
capcha





Категории