Installation procedure
English
1. Check the strength of the installation location.
This ceiling unit weighs approx. 19kg (41.9lbs).
Units: mm (in.)
350 (1325/32)
The display weights approx. 33kg (72.8lbs) to
300 (1126/32)
45kg (99.2lbs). Refer to the diagram on the right
and confirm that the four points for mounting the
Ceiling installation holes
)
ceiling unit and display are capable of bearing
14 (35/64)
/
32
Front
26
this weight. If the installation location is not
)
/
16
strong enough to bear this weight, reinforce the
15
300 (11
ceiling before the ceiling unit and display are
24 (
)
installed.
R7 9 /32
(R
2. Prepare the ceiling unit.
Ceiling unit
(upper section)
• Remove the two M8 assembly screws
from the ceiling unit and separate the
upper and lower sections of the unit.
M8 assembly screw
3. Install the ceiling unit
(upper section).
Ceiling unit
(lower section)
1. Before installing the upper section, pull
the wiring through the pipe. Use an
earthed mains extension lead (not
supplied).
2. Make holes in the ceiling using a
Flat washer
(not supplied)
method appropriate for the ceiling
Spring washer
structure and for inserting M12mm
(not supplied)
M12 bolt
bolts. Install the upper section using a
(not supplied)
hex socket bolt (M12 not supplied), flat
Signal cable
Earthed mains extension lead
washer and spring washer.
(example)
(example)
N o t e
Note
• Reinforce the ceiling if it is not strong enough.
• Use bolts appropriate for the ceiling material (not supplied).
• Refer to the installing examples for wooden structure and concrete structure.
Installing to a wooden structure(example)
Installing to a concrete structure(example)
Nut
Flat washer
Mounting plate
Concrete
(min.thickness 40mm [19/
" ] )
16
Nail
Anchor nut or
curled plug(M12)
Flat washer
Beam
Spring washer
Flat washer
M12 bolt
Spring washer
Ceiling board
M12 bolt
4
...