|
Инструкция по эксплуатации ADC, модель OmniReach FDH 3000
Производитель: ADC Размер: 308.37 kb Название файла: a38b686e-afbe-4fc5-9faa-4fc1691b5f9b.pdf
Язык инструкции:
|
|
|
|
Перейти к скачиванию
Фрагмент инструкции
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1 1 DESCRIPTION. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3 2 INSTALLATION RECOMMENDATIONS . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3 3 BASE CONSTRUCTION AND CONDUIT INSTALLATION. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3 4 CONCRETE PAD CONSTRUCTION. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5 5 GROUNDING SYSTEM INSTALLATION. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 6 6 CUSTOMER INFORMATION AND ASSISTANCE . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 7 INTRODUCTION This publication describes the Pad Mounting Frame (PMF) used with FDH 3000 small size cabinets and provides instructions for installation. Complete information about the FDH 3000 is provided in the User Manual (ADCP-96-114) that is shipped with the cabinet. Revision History ISSUE DATE REASON FOR CHANGE 1 05/2007 Original. 1406707 Rev A Page 1 © 2007, ADC Telecommunications, Inc. ADCP-96-123 • Issue 1 • May 2007 List of Changes PAGE IDENTIFIER DESCRIPTION OF CHANGE --Original. Trademark Information ADC and ADC Telecommunications are registered trademarks of ADC Telecommunications, Inc. OmniReach is a trademark of ADC Telecommunications, Inc. Admonishments Admonishments — in the form of Dangers, Warnings, and Cautions — must be followed at all times. These warnings are flagged by use of the triangular alert icon (seen below), and are listed in descending order of severity of injury or damage and likelihood of occurrence. Danger: Danger is used to indicate the presence of a hazard that will cause severe personal injury, death, or substantial property damage if the hazard is not avoided. Warning: Warning is used to indicate the presence of a hazard that can cause severe personal injury, death, or substantial property damage if the hazard is not avoided. Caution: Caution is used to indicate the presence of a hazard that will or can cause minor personal injury or property damage if the hazard is not avoided. Page 2 © 2007, ADC Telecommunications, Inc. ADCP-96-123 • Issue 1 • May 2007 1 DESCRIPTION The FD3-PMFC06, shown in Figure 1, is a stainless steel frame that provides a mounting base for the small size FDH 3000 cabinet when installed in a concrete pad foundation. Caution: Mounting the cabinet directly on a concrete pad may cause chemical corrosive action to the cabinet. Use only the Pad Mount Frame (PMF) as a mounting base for the cabinet. Do not use caulking compounds as a sealer between the cabinet and the PMF. 21935-A20.80 IN. (52.8 CM) 12.55 IN. (31.2 CM) 5.5 IN. (14.0 CM) Figure 1. FD3-PMFC06 Dimensions 2 INSTALLATION RECOMMENDATIONS The site chosen for the installation must conform to all local codes and any permits required must be obtained prior to the start of installation. The location must be accessible and provide adequate parking for worker and vehicle safety. Situate the concrete pad along the trench that was used for routing the OSP fiber cables for the system. The installed cabinet must not create a visual or physical obstruction to vehicular or pedestrian traffic. Ensure that there is sufficient space on all sides to facilitate cabinet installation. Depending on the landscaping requirements, the top surface of the concrete pad may be located from 0 to 3 inches (7.6 cm) above the surrounding grade. 3 BASE CONSTRUCTION AND CONDUIT INSTALLATION Prepare a base for the concrete pad that meets all local code requirements. The base must have a footing of 4 to 6 inches (10.2 to 15.2 cm) of gravel or other suitable fill (per local practice) on firmly compacted soil. Refer to the diagram shown in Figure 2 for the base construction details. Note: Use crushed rock 3/8-inch or less in size mixed with stone dust (per local practice) to for the base. The name of the material may differ in different geographical areas. Possible names are Class 5, stone dust, aughts (0s) and ones (1s), or stone aggregate Page 3 © 2007, ADC Telecommunications, Inc. ADCP-96-123 • Issue 1 • May 2007 Install the cable conduit from below and position it so that the top of each upward bend will be located within the PMF opening at the indicated point. When installed, the top of the conduit should be located 1 to 2 inches (2.54 to 5.08 cm) below the top of the finished concrete pad. Install the conduit before pouring the pad. REINFORCED CONCRETE PAD PAD MOUNT FRAME CAST IN PLACE 4 IN. DUCT FOR DISTRIBUTION CABLE (LOCATE 1 - 2 INCHES BELOW TOP OF PAD) GROUND ROD (LOCATE 1 - 2 INCHES BELOW TO...
Напишите ваш отзыв об устройстве
|
|