Войти:
Оценок - 2, средний балл: 3.5 ( )

Инструкция по эксплуатации ADTRAN, модель Threat Analysis Reporter TAR 1.0

Производитель: ADTRAN
Размер: 4.06 mb
Название файла: 0c416195-4785-48d5-9c5c-1a913eec7827.pdf
Язык инструкции:en
Перейти к скачиванию



Фрагмент инструкции


Screw the assembly securely to the rack using the brackets provided. Attach the other assembly to the other side of the rack, making sure that both are at the exact same height and with the rail guides facing inward. Install the Server into the Rack You should now have rails attached to both the chassis and the rack unit. The next step is to install the server chassis into the rack. Do this by lining up the rear of the chassis rails with the front of the rack rails. Slide the chassis rails into the rack rails, keeping the pressure even on both sides (you may have to depress the locking tabs when inserting). Installing the Server into a Telco Rack If you are installing the 8e6 server unit into a Telco type rack, follow the directions given on the previous pages for rack installation. The only difference in the installation procedure will be the positioning of the rack brackets to the rack. They should be spaced apart just enough to accommodate the width of the Telco rack. Install the “H” Server Bezel Before rack mounting the “H” unit, the bezel should be installed on the front end of the chassis. This portion of the installation process requires you to unpack the unit and bezel. NOTE: The bezel has been packaged separately from the unit to prevent damage during shipping. Front of bezel Outside of left inner rail Inside front end of left inner rail Inner left rail attached to chassis Pin on right side of bezel A. Remove the plastic wrapping from the left and right ears. B. On one side of the chassis (left or right), unscrew the inner rail from the chassis. C. Slide the loosened inner rail slightly backwards to release it from the clips at the side of the chassis, and then lay it down beside the chassis, with the inside of the rail facing up. D. On the inner rail that is still attached to the chassis, insert the bezel pin into the bottom hole of the ear. Be sure the pin is pushed all the way in so that it is flush against the ear. E. Take up the free end of the bezel and also the loosened inner rail. F. Return the loosened inner rail to its upright position and insert the bezel pin into the bottom hole of the ear. G. Slide the inner rail forward beneath the clips to lock it in place. H. Screw the inner rail back on the chassis. I. After it is installed, the bezel should drop down when it is gently tugged forward and downward. The bezel should remain upright when raised up and closed. Rack Mount the “H” Server Rack Mount Instructions Identify the Sections of the Rack Rails You should have received two rack rail assemblies with the 8e6 server unit. Each of these assemblies consists of two sections: An inner fixed chassis rail that secures to the unit (A), and an outer fixed rack rail that secures directly to the rack itself (B). Two pairs of short brackets to be used on the front side of the outer rails are also included. Install the Inner Rails Both the left and right side inner rails have been pre-attached to the chassis. Proceed to the next step. Install the Outer Rails Begin by measuring the distance from the front rail to the rear rail of the rack. Attach a short bracket to the front side of the right outer rail and a long bracket to the rear side of the right outer rail. Adjust both the short and long brackets to the proper distance so that the rail can fit snugly into the rack. Secure the short bracket to the front side of the outer rail with two M4 screws and the long bracket to the rear side of the outer rail with three M4 screws. Repeat these steps for the left outer rail. Locking Tabs: Both chassis rails have a locking tab, which serves two functions. The first is to lock the server into place when installed and pushed fully into the rack, which is its normal position. Secondly, these tabs also lock the server in place when fully extended from the rack. This prevents the server from coming completely out of the rack when you pull it out for servicing. Install the Server into the Rack You should now have rails attached to both the chassis and the rack unit. The next step is to install the server chassis into the rack. Do this by lining up the rear of the chassis rails with the front of the rack rails. Slide the chassis rails into the rack rails, keeping the pressure even on both sides (you may have to depress the locking tabs when inserting). When the server has been pushed completely into the rack, you should hear the locking tabs “click.” Finish by inserting and tightening the thumbscrews that hold the front of the server to the rack. Installing the Server into a Telco Rack If you are installing the 8e6 server unit into a Telco type rack, follow the directions given on the previous page for rack installation. The only difference in the installation procedure will be the positioning of the rack brackets to the rack. They should be spaced apart just enough to accommodate the width of the Telco rack. Install the Server Step 1: Initial Setup Procedures This step requires you to link the workstation to th...

Эта инструкция также подходит к моделям:
Сетевое оборудование - Threat Analysis Reporter TAR 1.0 (4.06 mb)
Сетевое оборудование - Threat Analysis Reporter TAR 1.0 (4.06 mb)
Сетевое оборудование - Threat Analysis Reporter TAR 1.0 (4.06 mb)

Напишите ваш отзыв об устройстве



Текст отзыва
Ваше имя:
Введите две цифры:
capcha





Категории