Войти:
Оценок - 2, средний балл: 3.5 ( )

Инструкция по эксплуатации American Standard, модель 3636.STTS

Производитель: American Standard
Размер: 51.11 kb
Название файла:
Язык инструкции:en
Перейти к скачиванию



Фрагмент инструкции


(Certain installations may require professional help.) Also be sure your installation conforms to local codes. For alcove (.STTS models) installation only: The opening dimensions should be 1/8" larger than dimensions shown. 752769-100 Rev. C NOTE: Read instructions completely before proceeding with installation. 972mm (38-1/4) 972mm 215mm (8-7/16) 215mm (8-7/16) 679mm (26-3/4) 3838.NEOTS 3636.STTS 4834.STTS 484mm FRONT FRONT (19-1/16) 870mm 215mm (8-7/16) 610mm (24) 914mm (34-1/4) (36) 484mm (19-1/16) (18) 1219mm 914mm (48) 457mm 215mm (8-7/16) (36) (38-1/4) Insure the floor and stud walls are square and plumb. Provide a 5" x 5" (127mm x 127mm) opening in the floor for the drain (see Figs. A & B). The drain plug accommodates a 2" (51mm) PVC waste pipe. The waste pipe should extend above the surface of the sub-floor 3/8" ± 1/16". Note: Variations in levelness of subfloor may require adjustment of waste pipe height. See product drawings on this page for the specified drain locations. 1 A 51 mm (2) PVC Waste Pipe 127mm x 127mm (5 x 5) Opening (See Product Chart for Drain Location) C/L C/L 3838 NEOTS 90° 90° B 3636.STTS, 4834.STTS 90° 90° 51 mm (2) PVC Waste Pipe 127mm x 127mm (5 x 5) OpeningC/L (See Product Chart for Drain Location) D C DRAIN ASSEMBLY Strainer Drain Body Shower Base Silicone Sealant Rubber Gasket Fiber Gasket Locking Nut Rubber Caulking Gasket 51 x 102 mm (2 x 4) Stud Wall Waterproof Drywall 13mm (1/2") minimum Bedding Material Area 3 mm (1/8) 127 mm (5) 51 mm (2) PVC Pipe Bedding Material No Bedding Under Apron Before installing drain into the shower base, remove strainer (see Fig. C). This will be installed after shower base is in its final position. Install the drain to the shower base as shown in Fig. D. Use silicone sealant between drain body and shower base. 2 3 3 4 5 After leveling base on subfloor, use base and mark studs. This will be the installed height of shower base. Mix the low-shrink bedding material (grout, mortar, plaster, etc.). Concrete is not recommended. Apply enough bedding material to support the entire bottom of the shower base. The bedding material must not be used under the apron (front edge). E Lift and lower base over center of drain pipe and set into place After the bedding material has been poured and before it sets, lower the shower base into position with the drain assembly sliding over the waste pipe as shown in Fig. E. It will be necessary to "rock" the shower base until the top of the tile flange aligns with the lines drawn in Step 3 on the stud walls. Make certain the apron is contacting the rough floor along the entire length of the shower base. Insure that the base is level in two directions (see Fig. F). Snap strainer back into place and check for proper drainage. F Level Level Level base in two directions. Note: Allow the bedding material to completely harden before applying weight to the bottom of the shower base. Tape over the strainer to protect the finish and prevent construction debris fr...

Эта инструкция также подходит к моделям:
Сантехника - 3838.NEOTS (51.11 kb)
Сантехника - 4834.STTS (51.11 kb)

Напишите ваш отзыв об устройстве



Текст отзыва
Ваше имя:
Введите две цифры:
capcha





Категории