|
Фрагмент инструкции
Installation Overview The minimum framing dimensions and clearances listed in this instruction sheet must be maintained. Failure to follow all of the instructions in this instruction sheet, and in the manual, will void the listing and warranty of the pellet heater, and may create a serious fire hazard. This kit is approved for use in a mobile home. 1 Determine the vent configuration (see “Vent Requirements” and “Vent Termination Requirements”) 2 Prepare the enclosure (see “Minimum Enclosure Dimensions”). 3 Install the floor protection and hearth (see “Minimum Floor Protection”). If venting to the rear (most common) Place the 90° onto the insert starter collar and measure the height of the center of the vent. This will determine the center height of the wall thimble installed behind the insert in the wall. NOTE: The vent is located 7.5” left of center of the appliance. Install the thimble into the wall, making sure the 3” clearance to combustibles is met (refer the directions included with the thimble for additional details). Remove the starter collar from the pellet heater and install it onto the elbow (seal with silicone). Determine the correct length for the horizontal section of vent (the center of the starter collar is 11.25” behind the enclosure opening) and attach it to the elbow (seal with silicone). Place this flue section aside until after the zc can is installed. Then insert the flue section through the can and thimble. Once the insert is in place, attach the starter section to the insert (it is attached with a latch – make sure the gasket is correctly positioned). Attach the additional vent components to finalize the vent installation (termination, elbow, etc.). If venting upwards When installing with vertical vent, the area above the insert must be accessible after the zc can and insert have been installed (note: the vent is located 11.25” behind the enclosure opening, 7.5” left of center). Remove the starter collar from the pellet heater and install it onto the vent (seal with silicone). Insert this vent through the zc can and attach the starter section to the insert (it is attached with a latch – make sure the gasket is correctly positioned). Attach the additional vent components to finalize the vent installation (additional vent lengths, elbows, terminations, etc.). 3 Construct and Install the ZC Can (see “ZC Can Construction and Placement”) 4 Prepare the insert in place it into the ZC Can (see “Insert Preparation and Placement”) Page 1 of 8 10/9/06 © Travis Industries, Inc. ZC Kit – Large Pellet Insert (99200149) Vent Requirements • Must be 4" diameter Type "L" (except for masonry fireplace installations) - or - connect the vent to a factory built type "A" chimney. All vent joints (including adapters, elbows, etc…) must be sealed with 500° F. RTV silicone. • Pellet vent must maintain a minimum 3" clearance to any combustible (install vent at clearances specified by the vent manufacturer). • Do not connect the pellet vent to a vent serving any other appliance or stove. • The maximum venting distance is shown in the illustration to the right. • Do not install a flue damper in the exhaust venting system of this unit. • Use an approved wall thimble when passing the vent through walls and a ceiling support/fire stop spacer when passing the vent through ceilings (make sure to maintain 3" clearance to any combustibles. • No more than 180° of elbows (two 90° elbows, one 90° and two 45° elbows, etc.). • Pellet vent connections must be sealed airtight with 500° F. RTV silicone and screwed together with at least three sheet metal screws. Seal each vent section (including adapters, elbows, etc...) by injecting a liberal amount of 500° F. RTV silicone into the gap between sections. • Vent must have a support bracket every 5' of pellet vent when exterior of structure • Horizontal sections must have a 1/4" rise every 12" of travel. 500°F. RTVSilicone 33 Feet (max.) 30 Feet The vent height and run 25 Feet must not exceed the distance shown in the shaded region shown to the right. 20 Feet Venting into this shaded area may require restrictor adjustments. See the 15 Feet section “Restrictor Adjustment” for details. 10 Feet NOTE: To achieve optimum performance, we recommend keeping the vent as short as possible 5 Feet (horizontal run especially). 0 Feet 0 Feet 5 Feet 10 Feet(max.) Page 2 of 8 10/9/06 © Travis Industries, Inc. ZC Kit – Large Pellet Insert (99200149) Vent Termination Requirements (See the illustration below) • Must have an approved cap (to prevent water from entering) or a 45° downturn. • If the termination is located on a windy side of the house, an approved house shield is recommended to prevent soot from building up on the side of the house. • Must not be located where it will become plugged by snow or other material. • Horizontal terminations must protrude 12" from the wall, vertical terminations require 24". H G A D F NOTE: Measure clearances to the nearest edge of the exhaust hood. A E B C ...
Эта инструкция также подходит к моделям:Плиты - ZC Kit (164.08 kb)