|
Фрагмент инструкции
Retain only a bare channel and channel end caps. Please dispose of lamps and ballast properly and recycle if possible. 3. - With bare channel, now begin installation of new retrofit kit, 4. - Prewire lamp holders / socket Insen lamp wire leads of new ballast inio #953 RS socket wire terminals. This should be completed according to the ballast manufacturer's wiring diagram printed on the ballast label. 5, - Install ballast with sockets attached to leads into channel. Make connections of supply wire to ballast using provided wire connectors. COO sS. 41/4" channel Optional RKD-E end-of-fixture row sockei-covers can be installed as shown below. 6. - Beginning at one end of the channel, install appropriate pre-wired socket into first #800 URS bracket. Using #8 TEK screws, attach the bracket flush with the end of the fixture channel. jm quarter-turn fastener #8 TEK screw self-tapping loc-screw 7. - Using steel channel cover as a spacing jig, place opposite bracket in place and attach with #8 TEK screws. (Spacing between brackets is 40") Note: When converting an 8’ section of fixture, feed the remaining two prewired #953 sockets above the bracket. Repeat steps #6 and #7 placing center two brackets back-to-back. 8. - Using self-taping loc-screws, attach reflector to the steel channel cover. 9. - Snap quarter-turn fasteners into holes each end of the reflector. 10. - Attach reflector and steel channel cover to the socket brackets using slots in brackets. 11.- Remove protective film coating and install lamps. 12. * Re-connect power. Note: Dimensions and specifications subject to change without notice. 041193 Cooper Lighting METALUX P.O. Bo* 1207 Americue, Georgia 31709 91?.924.0OOO Fax 912.924.550?...
Эта инструкция также подходит к моделям:Осветительные приборы - RKD-140RS-48-10B (43.18 kb)