Войти:
Оценок - 1, средний балл: 3 ( )

Инструкция по эксплуатации Carrier, модель 38QN

Производитель: Carrier
Размер: 677.7 kb
Название файла: 38qn-10si.pdf
Язык инструкции:en
Перейти к скачиванию



Фрагмент инструкции


It is automatically energized by the manually operated supplemental heat switch in the indoor thermostat subbase. The thermostat locks out compressor and the relay bypasses the outdoor thermostats for electric heater operation during heat pump shutdown. When one outdoor thermostat is used, a supplemental heat relay is not required. The supplemental heat switch in the indoor thermostat subbase bypasses outdoor thermostat, locks out compressor and activates electric heater. 3. Unit is shipped with valve stem(s) frontseated, and caps installed. Replace stem caps after system is opened to refrigerant flow (backseated). Replace caps finger tight and tighten additional % turn with wrench. See sticker on valve cap. 4. Turn on main disconnect switch(es) to indoor and outdoor units. 5. Set fan switch as desired (ON or AUTO). 6. Set thermostat dial at desired temperature. 7. Set selector switch at HEAT or COOL. Operate unit for 15 minutes. 8. Check system refrigerant charge. See Refrigerant Charging. Motors and controls are designed to operate satisfactorily in the voltage range shown in Table 3. If necessary to use manifold gages for servicing, refer to Carrier Standard Service Techniques Manual, Chapter 1, Refrigerants, Pages 1-5, Fig. 8 for bypass method of returning charge to system. Removal of liquid line charging hose without following these precautions could result in some loss of charge. Refrigerant Charging (Fig. 7 through 14) A CAUTION To prevent personal injury, wear safety glasses and gloves when handling refrigerant. Do not overcharge system. This can cause compressor failure. THERMOSTAT I—"1 "■ *■ — TERMINALS"-® 0 © © HOOK-AROUND VOLT/AMMETER 10 TURNS AROUND JAWS 0.5 AMPS FOR THERMOSTAT SETTING Fig, 5—Determining Amp Draw 4 THERMOSTAT SUBBASE HH93AZI73 OR HH93AZ175 40AQ OR 40QB FAN COIL COOLING CONTROL KIT TERMINAL BOARD 38QN TERMINAL BOARD THERMOSTAT SUBBASE HH93AZ173 OR HH93AZI75 40AQ OR 40QB ELECTRIC HEATER TERMINAL BOARD 38QN TERMINAL BOARD COOLING AND TWO-STAGE HEATING (38QN WITH 40FS/28HQ, VQ EQUIPPED WITH ELECTRIC HEATER; SUPPLEMENTAL HEAT, TWO OUTDOOR THERMOSTATS) A87154 THERMOSTAT SUBBASE HH93AZI73 OR HH93AZI75 40AQ OR 40QB ELECTRIC HEATER TERMINAL BOARD 38QN TERMINAL BOARD (38QN WITH 40AQ.40QB OR 40FS/28HQ,VQ EQUIPPED WITH ELECTRIC HEATER; SUPPLEMENTAL HEAT, NO OUTDOOR THERMOSTATS) B A87152 TH ERMOSTAT H H07AT171 40DQ ELEC. HEATER WITH HH93AZI73(AUTO. (ALL MODELS) 38QN CHANGEOVER) OR HH93AZI75 LOW VOLTAGE TERM. TERMINAL (MAN. CHANGEOVER) SUBBASE. SPLICE CONNECTIONS BOARD 0- &■ Hb Ш-- & a- &• 0 RED_ ORN -7®r- BRN_ VIO --- COOLING AND TWO-STAGE HEATING (38QN WITH 40DQ EQUIPPED WITH ELECTRIC HEATER; -0 ■HI] HjD -0 -43 0 SUPPLEMENTAL HEAT, NO OUTDOOR THERMOSTATS) A87156 THERMOSTAT SUBBASE ННЭЗА2173 OR HH93AZI75 40AQ OR 40QB ELECTRIC HEATER TERMINAL BOARD COOLING AND TWO-STAGE HEATING (38QN WITH 40AQ, 40QB OR 40FS/28HQ.VQ EQUIPPED WITH ELECTRIC HEATER; SUPPLEMENTAL HEAT, ONE OUTDOOR THERMOSTAT) ODT — Outdoor Thermostat SHR — Supplemental Heat Relay - Factory Wiring ----Field Wiring 'Transformer (60 va) located in cooling control kit or electric heater. fRemove factory-installed jumper (Connection B) when installing outdoor thermostats (ODT). A87155 Fig. 6—Control Circuit Connections 5 HEATING CYCLE CHECK CHARTS 20 (138) 30 (207) 40 50 60 (276) (345) (414) SUCTION PRESSURE AT SERVICE PORT Fig. 7—38QN015 Heating Cycle Check Chart 60 (4I4) SUCTION PRESSURE AT SERVICE PORT Fig. 8—38QN018 Heating Cycle Check Chart _!__i__i__I__!__________ PSIG I0 20 30 40 50 60 CkPa) (69) (138) (207) (276) (345) (4I4) SUCTION PRESSURE AT SERVICE PORT A87158 Fig. 9—38QN024 Heating Cycle Check Chart 10 20 30 (69) (138) (207) 40 50 60 (276) (345) (4I4) SUCTION PRESSURE AT SERVICE PORT A87159 Fig. 10—38QN030 Heating Cycle Check Chart 6 PRESS. AT LIQ. SERVICE VALVE piig PRESS. AT UQ. SERVICE VALVE p«lg HEATING CYCLE CHECK CHARTS (cont) 0 A 8 12 16 20 24 28 32 36 40 +4 48 52 56 60 64 68 PRESS. AT SUCT. SERVICE PORT psig Fig. 11—38QN036 Heating Cycle Check Chart (kPa) (69) (I38) (207) (276) (345) (4I4) SUCTION PRESSURE AT SERVICE PORT A87160 Fig. 12—38QN042 Heating Cycle Check Chart Fig. 13—38QN048 Heating Cycle Check Chart ÜJ tE 3 Q. y ce < x o 260 (I793) 240 220 (I5I7) 200 0379) 180 (1240 I60 (I ¡03) 140 (965) 120 (827) 43F :;i b. 80 F i::: CF M= I980 33 F WET-BULB TEMP, ENT OUTDOOR UNI" IR :i : IU / 70 ’I.I r C) r :t iy /- - “ £ : Z4h / (I5.6C) lb h 3.4 C w / / \m y ::/-l97 r y. / / ; i: / :: :::= -5F • / :::: 20.6 C)' W f :::^ C):. ..... / \ i i Hi: / / pm? / ? «Îiüü: :! / Nlji 4- ...


Напишите ваш отзыв об устройстве



Текст отзыва
Ваше имя:
Введите две цифры:
capcha





Категории