Войти:
Оценок - 2, средний балл: 3 ( )

Инструкция по эксплуатации Elkay, модель EDFP214FPC

Производитель: Elkay
Размер: 92.59 kb
Название файла:
Язык инструкции:en
Перейти к скачиванию



Фрагмент инструкции


(Fountain should be mounted to exterior wall) Create a loop in the cable and thread the free end of the cable through the wall into the freeze resistant box. The adjustment nuts should be in the middle of threaded area on the operating cable. See Figure 9 2. Connect free end of operating cable to the valve-operating bracket. The end of the cables must be recessed into the indents on the pivot brackets. 3. Remove cable free play by adjusting the jam nuts on the ends of the operating cable. See Figure 6 4. Connect water line from fountain bubbler into freeze resistant box. The connection to the box uses a quick connect water fitting. Position the water line, in the fountain, to drain back into interior mounted box. Any water left standing, in the exterior line, can freeze. To insert tubing, push tube straight into fitting until it reaches a positive stop. To remove tubing from the fittings, relieve water pressure, push in on dark gray collar while pulling out on the tubing. See Figure 11 5. Connect drain and water supply lines to the freeze resistant fountain. Refer to Figure 1 for component positions. Inline strainer must be used on the inlet water line. Start-up 1. Turn on building water supply and check all connections for leaks. Repair as required. 2. Stream height is factory set at 35 PSI. If stream height needs to be changed adjust the regulator in the freeze resistant package. Clockwise adjustment raises stream height, counter clockwise adjustment will lower stream. 3. Adjust operating cable as required. Cable system should have a minimal amount of free play to allow for proper valve operation. If the system is too tight the valve will stay in the on position creating constant water flow. Too much free play will result in non-operation of the valve with the push-buttons. 4. Note: Water from the drain back tube in the freeze resistant package, will continue to run while the valve is actuated. 5. After cable system is adjusted properly stuff flexible insulation into any openings between the outside wall and the interior box. 6. Recheck all connections. If all connections are leak free replace cover(s) on the freeze resistant box(es) and fountain(s). FIG. 10 NOTE: WATER FLOW DIRECTION BUILDING WATER INLET SERVICE STOP (NOT FURNISHED) 1/4" O.D. TUBE WATER INLET 3/8" O.D. UNPLATED COPPER TUBE CONNECT COLD WATER SUPPLY TUBE IS SECURED IN POSITION SIMPLY PUSH IN TUBE TO ATTACH PUSH IN COLLET TO RELEASE TUBE PUSHING TUBE IN BEFORE PULLING IT OUT HELPS TO RELEASE TUBE FIG. 11 OPERATION OF QUICK CONNECT FITTINGS PAGE 7 97565C (Rev. J - 8/07) EDFP210FP*B EDFP214FP*B EDFP217FP*B PARTS LIST ITEM NO. PART NO. DESCRIPTION 1 100322740560 GASKET 2 75570C SCREW-#10 X .50 PINNED TORX 3 15009C NIPPLE ASSY 4 27057C BRACKET-REGULATOR MOUNTING 5 27945C BRACKET-BASIN 6 27946C BRACKET-BASIN PIVOT 7 40045C HEX NUT 1-5/16 8 40206000 RETAINER 9 98118C BUBBLER ASSEMBLY 10 45662C PUSH BUTTON 11 45663C SLEEVE-PUSH BUTTON GUIDE 12 50198C SNAP BUSHING 13 51667C BUMPER-REG. ...

Эта инструкция также подходит к моделям:
Морозильные камеры - EDFP210FPC (92.59 kb)
Морозильные камеры - EDFP217FPC (92.59 kb)

Напишите ваш отзыв об устройстве



Текст отзыва
Ваше имя:
Введите две цифры:
capcha





Категории