![@name](/images/flag/s/en.gif)
Follow all local codes. Installation Items Needed Before installing log set, make sure you have the items listed below. • piping (check local codes) • sealant (resistant to propane/LP gas) • equipment shutoff valve • test gauge connection • adjustable (crescent) wrench or pliers • sediment trap • tee joint • pipe wrench Installation must include an equipment shutoff valve with "T" style handle, gas union and, for propane/LP gas only, a plugged 1/8" NPT tap. Locate NPT tap within reach for test g