Войти:
Оценок - , средний балл: ( )

Инструкция по эксплуатации Cisco Systems, модель SFS 7008P

Производитель: Cisco Systems
Размер: 4.64 mb
Название файла: 25version.pdf

Язык инструкции:enfi

Документ загружается, подождите пожалуйста
Документ загружается, подождите пожалуйста

Фрагмент инструкции


This publication contains these sections: • Safety Overview, page 2 • Parts List, page 2 • Required Tools, Equipment, and Personnel, page 2 • Before You Install, page 3 • Installing the Cisco SFS 7008P Switch into a Rack, page 6 • Troubleshooting, page 20 • Translated Safety Warnings, page 21 • Obtaining Documentation, page 27 • Documentation Feedback, page 27 • Cisco Product Security Overview, page 28 • Obtaining Technical Assistance, page 29 • Obtaining Additional Publications and Information, page 31 Corporate Headquarters: Cisco Systems, Inc., 170 West Tasman Drive, San Jose, CA 95134-1706 USA © 2006 Cisco Systems, Inc. All rights reserved. Safety Overview Safety Overview Safety warnings appear throughout this publication in procedures that may harm you if performed incorrectly. A warning symbol precedes each warning statement. Warning IMPORTANT SAFETY INSTRUCTIONS This warning symbol means danger. You are in a situation that could cause bodily injury. Before you work on any equipment, be aware of the hazards involved with electrical circuitry and be familiar with standard practices for preventing accidents. Use the statement number provided at the end of each warning to locate its translation in the translated safety warnings that accompanied this device. Statement 1071 SAVE THESE INSTRUCTIONS Parts List The following items are included in your SFS 7008 package: • Chassis with TopSpin OS v2.5.0 preloaded • 2 Serial Cable Kits – Serial Cable – Serial cable document – DB-9 connector male to RJ-45 – DB-9 connector female to RJ-45 – MX-9-1 roll-over cable • Power cord for each power supply • Bezel • Parts bag • Regulation and Compliance Statement • 1 year warranty package (Cisco PN 83-1190-01) Required Tools, Equipment, and Personnel In addition to the accessories provided with the switch, you should have the following: • A #2 Phillips screw driver • Screws (not provided) to attach the mounting brackets to the rack • Any associated mounting clips to secure the brackets to your rack (two for each rail of the rack) • A rack with enough clearance for the Cisco SFS 7008P switch and cables. 2 Cisco SFS 7008P InfiniBand Server Switch Installation and Configuration Note 78-17434-01 Rev. A0 Before You Install • Three people to complete the installation (highly recommended). The Cisco SFS 7008P switch chassis weighs up to 106 pounds fully loaded. Before You Install Before you begin the installation, do the following: • Make sure that you have the right cables and sufficient ventilation. • Open the Cisco SFS 7008P package and remove the chassis, rack brackets, parts bag, and documentation from the box. Remove the packaging from around the chassis. After you have removed the straps, lift the box up and away from the switch and pallet. Do not cut the packaging, as you could damage the switch. Save the box and packaging. • Prepare a management workstation, such as a PC or laptop running a terminal program with a rollover M/F DB-9 serial cable (included). Verifying Basic Hardware If you have not purchased a fully loaded chassis with high-availability components installed, verify that you have the minimum components necessary to run the chassis. Specific components in the Cisco SFS 7008P switch (see Figure 1 and Figure 2) have interdependencies on other components. Check for basic hardware by following these steps: Step 1 Verify that you have at least one management interface module installed in slot 15 at the back of the unit. (See Figure 1.) Slot 15 is paired with the Fabric Controller in slot 11. (See Figure 2.) Cisco SFS 7008P InfiniBand Server Switch Installation and Configuration Note 78-17434-01 Rev. A0 3 4 Cisco SFS 7008P InfiniBand Server Switch Installation and Configuration Note 78-17434-01 Rev. A0 Verifying Basic Hardware Figure 1 Back of Unit Step 2 Verify that you have a Chassis ID module installed. (See Figure 1). Step 3 Verify that you have a Fabric Controller installed in the Core slot (see slot 11 in Figure 2). A second Fabric Controller module (installed in slot 12) is not required for the chassis to function, but is required to have a non-blocking fabric. 144988 Management I.O modules Power plug 2 Power plug 1 Chassis ID Main air exhaust 4x copper line interface modules 5 Cisco SFS 7008P InfiniBand Server Switch Installation and Configuration Note 78-17434-01 Rev. A0 Verifying Basic Hardware Figure 2 Cisco SFS 7008P Switch Front ViewWithout Bezel Step 4 Verify that you have at least one power supply installed. (See Figure 2.) Step 5 Verify that you have at least one fan module installed. (See Figure 2.) Step 6 Verify that you have at least one fabric module installed in one of the node slots. The node slots are 9, 10, 13 and 14. (See Figure 2.) Step 7 Verify that you have two LIMs installed for each fabric module in the node slots. See Figure 3 for an example of the connections between the LIMs and the fabric modules in the node slots: 154497 System Status LED pp y Status LED Power Supply identity LED...

Напишите ваш отзыв об устройстве



Текст отзыва
Ваше имя:
Введите две цифры:
capcha





Категории