Войти:
Оценок - 4, средний балл: 4.3 ( )

Инструкция по эксплуатации Cecilware, модель BT3

Производитель: Cecilware
Размер: 1.74 mb
Название файла: 6ae4018c-9940-0044-55ca-cc25c576bde6.pdf
Язык инструкции:en
Перейти к скачиванию



Фрагмент инструкции


we agrw to repair, at our option or repl«c* without cost to user such parts which prove upon factory inspection to hove been 90 detective A» equipment must be shipped transportation charges prepaid lor acceptance This warranty cows replacement part* only, labor charges are covered tor 60 days alter installation This warranty does no« apply under the loaowmg conditions • neglect or abuse at equipment • excessive lime condition • improper nM*»sl>on • Shy outside modification to eouipmenl Every Cealware urn body is covered lot three years This warranty covers the stainless steel body and Mamins sleet liners only, finable equipment such aa Electric Fryers, Food Warmers- Electric Stoves. Dispensers, Plug-In Urn*. Coftee Brewers and Warmers must be returned to the faefcxyor brought to an authorized service station lor repair MODEL # GENERAL SPECIFICATIONS ELECTRICAL DATA Width Depth Height Ship wt. (lbs.) Watts Volts Amps BT2 ■ 2 Station Pourover 17V2" 9V 20'/«1' 26 1600 2200 120 220 13.3 10.0 BT2A • 2 Station Automatic W'k" 9V2" 20MT 26 1600 2200 120 220 13.3 10.0 8T3 • 3 Station Pourover 17%" 9V2" 20%" 27 1700 2300 120 220 14.2 10.5 BT3A • 3 Station Automatic 17%" 91/2” 20%” 27 1700 2300 120 220 14.2 10.5 WARNING: MACHINE WARRANTY IS VOID IF MACHINE IS CONNECTED TO ANY VOLTAGE OTHER THAN 120 VOLTS. (EXPORT UNITS SHOULD BE CONNECTED TO 220 VAC VOLTS.) ♦•INSTALLATION INSTRUCTIONS** NOTE: A SEPARATE CIRCUIT SHOULD BE SUPPLIED FOR EACH OF THESE BREWERS WITH A 15 AMP CIRCUIT BREAKER OR FUSE. CHECK LOCAL CODES FOR COMPLIANCE IN INSTALLATION. CAUTION: DO NOT CONNECT BREWER TO POWER SOURCE UNTIL AFTER PRIMING. (INSTRUCTION BELOW.} CECILWARE CORPORATION 43-05 20th Avenue, Long Island City, NY 11105 2551 Femwood Avenue, Lynwood. CA 90262 N203A-1/95 1 WARNING: MACHINE WARRANTY IS VOID IF MACHINE IS CONNECTED TO ANY VOLTAGE OTHER THAN 120 VOLTS. (EXPORT UNITS SHOULD BE CONNECTED TO 220 VAC VOLTS). «»INSTALLATION INSTRUCTIONS** NOTE: A SEPARATE CIRCUIT SHOULD BE SUPPLIED FOR EACH OF THESE BREWERS WITH A 15 AMP, CIRCUIT BREAKER OR FUSE. CHECK LOCAL CODES FOR COMPLIANCE IN INSTALLATION. CAUTION: DO NOT CONNECT TO POWER SOURCE UNTIL AFTER PRIMING (INSTRUCTION BELOW). WATER HOOK-UP (FOR AUTOMATIC BREWERS ONLY • BT2A, BT3A) Automatic Brewers should be hooked up by a plumber in compliance with local plumbing codes. The National Sanitation Foundation (NSF) requires the following for NSf approved hook-up: 1. A quick discorned water connection or enough extra coiled tubing, (at least two times of the depth of brewer) so that brewer can be moved to dean underneath. 2. An approved ftowback prevention device such as a double check valve to be installed between brewer and water supply. You automatic coffee brewer was shipped with a water hook-up kit consisting of a strainer, length of %" (outside diameter) copper tubing and water valve fitting which connects to valve in rear of brewer. This fitting needsd to be finger tightened only. Connect the open end of the strainer to V O.D. tubing and a shut-off (supplied by others) leading to cold water supply. 20-120 PSJ water pressure, required for proper operation. CAUTION: These brewers are equipped with a rear Toggle Switch which controls the power supply to the Brewer Toggle Switch must be in the down or “OFF' position until step (3) is completed. TO PRIME THESE INSTRUCTIONS ARE FOR INITIAL PRIMING ONLY AND DO NOT HAVE TO BE REPEATED FOR NORMAL OPERATION. 1. Remove sample fitter pack from tunnel and insert funnel back into machine 2. Place an empty decanter on warmer plate directly under funnel. 3. lift cover (69 Fig. 3) and pour 3 decanters of cold water through the top opening at 3 minute intervals After the third decanler is poured, water will flow through spray head and tunnel and fill decanter beneath. 4. Plug line cord into receptacle and turn on power switch. The power light will light indicating power is applied to the tank heater Wait approximately 15 minutes for the water to reach brewing temperature, at which point the green light will light You are now ready to brew coffee **BREWING INSTRUCTIONS** AUTOMATIC MODELS BT2A. BT3A 1. Make sure power switch and green ready light are on. (Wait for green ready light to come on if necessary). 2. Place paper fitter in brew funnel. Open pack of fine grind coffee (as recommended by your coffee supplier) and spread evenly on filter paper. 3. Insert Brew funnel back into machine and place empty decanter under tunnel, 4 Turn on warmer switch and press brew switch Coffee will be ready in 3% minutes. 5 Adjust timer (if necessary to fill decanter to |ust below band on handleHrefer to instructions for timer adjustment). 6. Remove grounds and filter as soon as coffee has dripped through. Never pour coffee back through spent grounds POUR-OVER MODELS (BT2. BT3) 1 Follow steps 1, 2 and 3 above 2. Filt decanter wlh cold water to just below band on handle, lift cover (69. Fig.3), and pour water through ...


Напишите ваш отзыв об устройстве



Текст отзыва
Ваше имя:
Введите две цифры:
capcha





Категории