Войти:
Оценок - 4, средний балл: 4.5 ( )

Инструкция по эксплуатации Bionaire, модель 127176

Производитель: Bionaire
Размер: 1.15 mb
Название файла: BFH5000-CN_43_7015028.pdf
Язык инструкции:en
Перейти к скачиванию



Фрагмент инструкции


Wall Mount Installation: This product weighs 25 lbs. Do not install alone. Mounting Template with instructions is attached below to make mounting your Fireplace Heater easy. • Wall Mount Hardware Kit includes: 4 - 1.5” Phillips head self tapping screws 4 - toggle bolts 2 - mounting brackets IMPORTANT: Before drilling into any wall ensure no electrical cables are present in the area. Max. height of 47” (1.2 m). Make sure you allow at least 3 feet (1m) of space on the sides of unit. 1. Remove stand from main unit, if installed. 2. Secure the mounting brackets to the wall using the Wall Mounting Template provided (see below). 3. Hang main body on wall brackets by lifting over the bracket and sliding down. 4. Use Cord Wrap to hide extra cord. OPERATING INSTRUCTIONS • There may be an odor coming from the heater the first time you use it. This is normal during the break-in period. Make sure the heater is in a well ventilated area and continue running it until the smell goes away. • You may hear a popping or crackling sound as the heater heats up. This is normal and safe operation. • The Fireplace Heater can be operated by using the remote control (Fig. 1) or the control panel (Fig. 2) located on the top of the unit. • Place the heater on a firm, level surface or mount on wall. • Avoid overloading your circuit by not using other high wattage appliances in the same outlet. At 1500 Watts, this unit draws 12.5 Amps. (Front of Heater) (Back of Heater) Power On/Off Turn Power ON. LCD and Power Light will illuminate. The units default settings are: Temperature 80°; Timer OFF; Flame Brightness HIGH; Sound ON. (Front of Heater) (Back of Heater) Thermostat • Press Thermostat button until desired temperature level appears on LCD Display. It is recommended to start by setting the temperature to the highest setting. When your room reaches the desired comfort level, lower the thermostat until the heat stops and thermostat light turns off. Note: the fan will continue to run for flame operation. • The system now maintains the selected comfort level by automatically turning the heater ON and OFF. The Thermostat light cycles ON and OFF with the heater element as it maintains the programmed temperature. • When LCD reads 00 the heat will turn off but the fan will continue to run for flame operation. (Front of Heater) (Back of Heater) Timer You can set the timer to automatically turn the unit off. Press the Timer button, select between 1 and 12 hours. Your selection will then be displayed on the LCD. (Front of Heater) (Back of Heater) Flame Brightness There are four flame brightness settings: High , Medium , Low , Off . Press button to select desired brightness. (Front of Heater) (Back of Heater) Sound Press Sound button to adjust 4 sound levels or turn crackling sound on or off. (Front of Heater) (Back of Heater) Fahrenheit/Celsius Press to show temperature in Fahrenheit or Celsius. (Front of Heater) Fig. 2 (Back of Heater) Fig. 1 Wall Mounting Template To mount into wall studs 1. Find studs in wall. Studs are typically 16” (40 cm) apart. 2. Cut Mounting Template on dotted line and tape onto wall so brackets are centered on studs. 3. Use level to make sure template is level. Using a sharp object such as an awl, mark hole location. 4. Using a Power Driver with Phillips head bit, drive 1.5” (38 mm) screws through bracket and drywall into wood or metal stud. IMPORTANT: Before drilling into any wall ensure no electrical cables are present in the area. To mount into drywall Use toggle bolts for 3/8 - 5/8” (10 – 16 mm) thick drywall. 1. Cut Mounting Template on dotted line and tape onto wall. Use level to make sure template is level and mark wall with a sharp object such as an awl. 2. Drill 3/8” (10 mm) holes at top and bottom of bracket guide in center of studs. 3. A - Align bolts, through bracket holes then thread on Spring Loaded Wings. B - Collapse Wings while pushing through hole in wall. C - Pull bolt out to secure Toggle Wings against inside of wall (wings spring open on other side of wall and securely hold bolt and bracket). D - Screw bolt in until tight. Mark for Drill Mark for Drill Mark for Drill Mark for Drill 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 Bracket Bolt Toggle Wall Drilled Hole Wall Spring Loaded Toggle opens on inside of wall Included for mounting: 4 - 1.5” (38 mm) Phillips head self tapping screws 4 - toggle bolts 2 - mounting brackets Glass Panel Heat Vent Control Panel Buttons LCD Display Power Light Removable Stand Key to Icons FRONT Remote Control Control panel Handle Hanging Brackets Light Bulbs Cord Wrap BACK On/Off Thermostat Timer Flame Brightness Sound Fahrenheit/Celsius Brackets 3 ft. 3 ft. minimum 3 ft. BRACKET GUIDE BRACKET GUIDE Note: The mounting hardware included is intended for mounting the heater on 3/8” to 5/8” (10 – 16mm) drywall affixed to wood or metal studs. For your convenience the wall mount brackets are 16” (40 cm) on center to align with 2 studs. Not all studs will be 16” (40 cm) on center. ...


Напишите ваш отзыв об устройстве



Текст отзыва
Ваше имя:
Введите две цифры:
capcha





Категории