Войти:
Оценок - 3, средний балл: 4.3 ( )

Инструкция по эксплуатации Empire Products, модель DVC-35T-1

Производитель: Empire Products
Размер: 1.33 mb
Название файла:
Язык инструкции:en
Перейти к скачиванию



Фрагмент инструкции


Now, use the following Steps to complete installation of the SOK-1. 1. Using the inner and outer boots as hole templates, mark and drill four (4) 1/8” (3mm) diameter holes in the inner shield and four (4) 1/8” (3mm) diameter holes in the cabinet side. 2. Locate and cut a 6 3/4” square opening through wall. 3. Attach furnace to wall (see Attaching Furnace to Wall). 4. With furnace in place, after checking alignment of side outlet opening in wall and furnace, place the 9 3/8” x 9 3/8” side outlet wall plate over outer boot, pass the outer boot through the wall and attach side wall plate to furnace side of wall with two (2) 10 x 1 1/2” provided screws. 5. Attach outer boot to the cabinet side with four (4) 8 x 1/4” provided screws. 6. Position and attach inner boot to inner shield with four (4) 8 x 1/4” provided screws. 7. Place the register over the 6 3/4” square opening with the louvers positioned for the desired discharge direction and mark the mounting holes using the register as a template. Figure 5 Figure 6 13119-6-0107 Page 9 Locating Electric Supply A 7/8” diameter knockout is provided at the bottom of the left and right side panels. A three-prong (grounding) plug assembly is located within the control compartment (bottom) of the furnace. Please remove 7/8” knockout from appropriate side panel when routing plug assembly to an electrical outlet. Unit can be hard wired when recessed. Remove the 3 prong plug assembly and terminate inside the unit junction box. with two (2) plastic expansion anchors provided and to floor, at the outer casing bottom, with two (2) 10 x 1 1/2” screws provided. Figure 7 Installation of Three-prong (Grounding) Plug Assembly 1. Disconnect nylon cap on 3’ plug assembly from nylon plug on wiring harness. Remove 3’ plug assembly from control compartment (bottom) of the furnace. 2. Remove 7/8” knockout from appropriate side panel. 3. Insert nylon cap on 3’ plug assembly into the 7/8” hole in the side panel. 4. Connect nylon cap on 3’ plug assembly to nylon plug on the wiring harness. 5. Place 7/8” strain relief bushing around the cord of the 3’ plug assembly. Insert 7/8” strain relief bushing into the 7/8” hole in the side panel. Attention! The 7/8” strain relief bushing is located within the same envelope as the Installation Instructions and Owner’s Manual. Attaching Furnace to Wall Placecollaronfourinchfluetubeagainstoutletbox.Alignclearance holes on collar with screw holes in outlet box. Attach four inch flue tube to outlet box with four (4) 10 x 1/2” screws. Attention: Do not overtighten screws because outlet box must be able to move as flue tube expands and contracts. Place collar on six inch air tube against air drop. Align clearance holes on collar with screw holes in air drop. Attach six inch air tube to air drop with eight (8) 10 x 1/2” screws. Refer to Figure 5 for the location of the 7 1/2” diameter wall opening for the furnace. After the wall opening has been located and cut, position flue outlet on furnace in center of wall opening. Insert tubes through wall opening. When attaching furnace to the wall remove that portion of baseboard and molding on the wall which is behind the furnace. Attach furnace to wall, at the outer casing top, Figure 8 Using Plastic Expansion Anchors 1. After locating mounting holes, drill two (2) 5/16” diameter holes into the wall. 2. Insert two (2) plastic expansion anchors provided into the holes. 3. Tighten two (2) 10 x 1” screws provided into the plastic expansion anchors. (See Figure 9) Figure 9 Attention! The screw holes on the outer casing bottom are off-set the floor approximately 3/8”. Do not over-tighten screws and distort the off-set on the outer casing bottom. Distortion of the outer casing bottom will not allow the lower front panel to be attached to the furnace. Page 10 13119-6-0107 INSTALLATION INSTRUCTIONS (continued) Installing Vent Assembly Attention: DO NOT attempt to cut vent tubes. When you order appropriate vent kit for measured wall depth the vent tubes will fit together. 1. Place provided caulking beneath the collar of the outside mounting plate. Use additional caulking to correct uneven wall surface, such as clapboard. 2. Insert six inch air tube on outside mounting plate INTO six inch air tube attached to air drop. Place four inch flue tube on vent cap OVER four inch flue tube attached to outlet box. Position the outside mounting plate so that six inch air tube has a slight downward slope to the outside. The downward slope is necessary to prevent the entry of rainwater. Attach outside mounting plate to exterior wall with four (4) 10 x 1 1/2” screws. 3. Installation is completed. Reassembly And Resealing Vent-Air Intake System When vent-air intake system is removed for servicing the furnace, the following steps will assure proper reassembly and resealing of the vent-air intake assembly. 1. Remove old caulking beneath the collar of the outside mounting plate. Apply new caulking beneath the collar of the outside mounting p...

Эта инструкция также подходит к моделям:
Электрообогреватели - DVC-35IPT-1 (1.33 mb)

Напишите ваш отзыв об устройстве



Текст отзыва
Ваше имя:
Введите две цифры:
capcha





Категории