|
Фрагмент инструкции
GC is responsible for removal of all debris from property. First trip will include: • Coordinate installation with the construction supervisor • Explain the electrical, plumbing and venting connections • Uncrate oven and proof box • Move equipment to final location • Assemble the equipment and components and set in place • Coordinate the final hookups with contractor • After notification that final connections are made, Hobart will coordinate a second trip Second trip will include: • Verify final hookups • Start-up and adjustments of equipment to manufacturers settings and specifications • Calibrate and make adjustments as needed • Verify all equipment functions and unit is ready for production • Complete installation checklist and forward to Hobart for review and startup of warranty coverage Hobart will follow up within 30 days after startup to verify unit is properly operating to customer satisfaction. Other installation support available, at additional cost, includes: • Overtime installation • Storage of equipment at service office • Receiving • Unloading • Moving equipment • Special handling through restricted doorways and levels • Perform final hookup of utilities • Removal or disposal of old units in remodel locations...
Эта инструкция также подходит к моделям:Электрические печи - OV500G2 (25.08 kb)
Электрические печи - OV500E1 (25.08 kb)
Электрические печи - OV500G1 (25.08 kb)