|
Фрагмент инструкции
The UPS provides continuous power from its internal battery until the utility line returns to safe levels or the battery is fully discharged. 1: INSTALLATION Unpack Attention: Read the safety instruction sheet before installation. Inspect the UPS upon receipt. Notify the carrier and dealer if there is damage. The packaging is recyclable; save it for reuse or dispose of it properly. Check the package contents: Attention: The UPS comes with battery disconnected. • UPS • UPS literature kit containing: • Product documentation, safety and warranty information • Smart-UPS® User Manuals CD • PowerChute® Business Edition CD • Serial communication cable • 230 V models: Two jumper cables Position the UPS 1 in (2.5 cm) 1 2: START UP Connect the Battery .• Connect black wire to battery. (Red wire is already connected.) Note: Small sparks at Bottom of unit the point of battery connection are normal. Connect Equipment to the UPS Rear Panels 110/120 V: 230 V: • 230 V models: The top off-white outlet provides surge protection only. Equipment plugged into this 500 VA outlet should require surge protection, but should not require power during a utility power failure. The lower three outlets provide battery backup protection, as well as protection from surges. • Note: A laser printer draws significantly more power than other types of equipment and may overload the UPS. 2 Connect the UPS to the Network (if Applicable) Network Connectors Serial Port Telephone/Network Surge Suppression Ports Use only interface kits approved by APC. Use only the supplied cable to connect to the Serial Port. A standard serial interface cable is incompatible with the UPS. The UPS features optional telephone/network surge suppression. Connect a single line telephone or a 10 Base-T/ 100 Base-Tx network cable into the RJ-45/RJ-11 telephone/network surge protection IN jack on the back of the UPS. Use a telephone cable (not supplied) or network cabling (not supplied) to connect the OUT jack to a fax modem or network port. Start the UPS 1. Plug the UPS into a two-pole, three-wire, grounded receptacle only. Avoid using extension cords. 110/120 V models: The power cord is attached to the UPS. The input plug is a NEMA 5-15P. 230 V models: The power cord set is supplied in the UPS literature kit. Attention: Upon utility power connection, the top outlet is immediately powered; the bottom three outlets are powered after the UPS performs the self-test. 2. 110/120 V models: Check the site wiring fault LED located on the rear panel. It will be illuminated if the UPS is plugged into an improperly wired utility power outlet (see Troubleshooting). 3. Turn on all connected equipment. To use the UPS as a master on/off switch, be sure all connected equipment is on. 4. Press the button on the front panel to power the UPS. Note: The battery charges fully during the first four hours of normal operation. Do not expect full battery run capability during this initial charge period. Refer to for battery runtimes. 5. For optimal computer system protection, install PowerChute Business Edition management software to fully configure UPS shutdown and alarm settings. 3 3: OPERATION Front Display Panel 110/120 V 230 V INDICATOR DESCRIPTION On Line The UPS is supplying utility power to the connected equipment. On Battery The UPS is supplying battery power to the connected equipment. Overload The connected loads are drawing more than the UPS power rating. Replace Battery The battery must be replaced. FEATURE FUNCTION Power Button Press this button to turn the UPS on or off. (Read on for additional capabilities.) Self-Test Automatic: The UPS performs a self-test automatically when turned on, and every two weeks thereafter (by default). During the self-test, the UPS briefly operates the connected equipment on battery. Manual: Press and hold the button for a few seconds to initiate the self-test. Cold Start Supply battery power to the UPS and connected equipment in the absence of utility voltage (see Troubleshooting). Press the button for one second and release. The UPS will beep briefly and go quiet. Press and hold the button again, but for approximately three seconds. The unit will emit a sustained beep. Release the button during this beep. 4 4: USER CONFIGURABLE ITEMS NOTE: SETTINGS ARE ADJUSTED THROUGH POWERCHUTE BUSINESS EDITION SOFTWARE FUNCTION FACTORY DEFAULT USER SELECTABLE CHOICES DESCRIPTION Automatic Self-Test Every 14 days (336 hours) Every 7 days (168 hours), Every 14 days (336 hours), On Startup Only, No Self-Test Set the interval at which the UPS will execute a self-test. UPS ID UPS_IDEN Up to eight characters (alphanumeric) Uniquely identify the UPS, (i.e. server name or location) for network management purposes. Date of Last Battery Replacement Manufacture Date mm/dd/yy Reset this date when you replace the battery module. Minimum Capacity Before Return from Shutdown 0 percent 0, 15, 50, 90 percent Specify the percentage to which batteries will be charged fol...
Эта инструкция также подходит к моделям:Источники питания и БП - 120 Vac (280.31 kb)