Войти:
Оценок - 3, средний балл: 3.7 ( )

Инструкция по эксплуатации Armstrong World Industries, модель 57200

Производитель: Armstrong World Industries
Размер: 202.97 kb
Название файла:
Язык инструкции:en
Перейти к скачиванию



Фрагмент инструкции


Calcium Chloride Tests for moisture must be conducted. Armstrong offers a guideline of a maximum acceptable moisture emission level of 5.0 lbs. per 1000 sq. ft. per 24 hours. Bond Tests should also be conducted for compatibility with the substrate. When testing for alkalinity, the allowable readings for the installation of Armstrong flooring are 5 to 9 on the pH scale. Temperature shall be maintained at a minimum of 65° F (18° C) and a maximum of 100° F (38° C) for 48 hours prior to installation, during installation and 48 hours after completion. A minimum temperature of 55° F (13° C) shall be maintained thereafter. Condition all flooring materials and adhesives to room temperature at least 48 hours prior to starting installation. Protect all materials from the direct flow of heat from hot-air registers, radiators, or other heating fixtures and appliances. Procedure These products should be installed with the following adhesives: Subfloor Wood Underlayment Concrete Ceramic, Marble, Terrazzo Metal Existing Resilient Floor Adhesive S-515 S-700 S-750 S-89 S-515 S-700 S-750 S-89 S-515 S-700 S-750 S-89* S-700 S-515 S-750 Tile-On™ *S-89 may only be used over steel, stainless steel, aluminum and lead. NOTE: Install each ARTEFFECTS tile with the arrows pointing in the same direction for a nondirectional look. Detailed instructions may be found in the Armstrong Guaranteed Installation Systems manual, F-5061. MAINTENANCE These products are designed to be maintained by traditional resilient flooring maintenance methods, which include the use of polishes, spray-buffing techniques and appropriate high–speed maintenance systems. Initial Maintenance Immediately After Installation ¦ Sweep or vacuum thoroughly. ¦ Damp mop with a dilute neutral detergent solution such as Armstrong S-485 Floor Cleaner – carefully wiping up black marks and excessive soil. ¦ Apply two coats of high quality commercial floor polish such as Armstrong S-480. ¦ Do not wash, scrub or strip the floor for at least four to five days after installation. Preparation for Commercial Use For specific, ongoing maintenance procedures see Armstrong Maintenance Recommendations & Procedures for Commercial Resilient Flooring booklet, F-8663. WARRANTIES Armstrong warrants its regular (first quality) commercial floors and wall base to be free from manufacturing defects and warrants the installation integrity for five years from the date of purchase, if installed according to the Armstrong Guaranteed Installation Systems manual, F-5061. This warranty extends only to the original end-user. See Armstrong Commercial Floor Warranty, F-3349 or visit armstrong.com for warranty details, limitations and exclusions. WARNING: EXISTING IN-PLACE RESILIENT FLOOR COVERING AND ASPHALTIC ADHESIVES. DO NOT SAND, DRY SWEEP, DRY SCRAPE, DRILL, SAW, BEADBLAST, OR MECHANICALLY CHIP OR PULVERIZE EXISTING RESILIENT FLOORING, BACKING, LINING FELT, ASPHALTIC “CUTBACK” ADHESIVE, OR OTHER ADHESIVE. These existing in-place products m...

Эта инструкция также подходит к моделям:
Интерьер - 57203 (202.97 kb)
Интерьер - 57210 (202.97 kb)
Интерьер - 57215 (202.97 kb)
Интерьер - 57201 (202.97 kb)

Напишите ваш отзыв об устройстве



Текст отзыва
Ваше имя:
Введите две цифры:
capcha





Категории