Войти:
Оценок - 3, средний балл: 3.7 ( )

Инструкция по эксплуатации Louisville Tin and Stove, модель BBT103

Производитель: Louisville Tin and Stove
Размер: 638 kb
Название файла: 3aadb3ac-dd4c-4e0c-84bf-3a04e0614dfb.pdf
Язык инструкции:en
Перейти к скачиванию



Фрагмент инструкции


STEP 1. a) b) c) d) e) LOCATE VENT OPENING (Requires a 2-1/2” hole when not using vent weather seal kit). Select area on wall where heater will be installed. Check outside vent termination for proper clearances. See Figure 1. Locate studs behind heater location. Using template supplied, mark location for 2-1/2” hole between studs. See Figure 2. Cut vent openings through both the inside and outside walls, being sure to maintain level across both openings. VENT HOLE LOCATION FOR THE AIR INTAKE AND EXHAUST TUBES FOR STANDARD INSTALLATION 2-1/2” DIA. HOLE. NOTE: 3” DIA. HOLE REQUIRED FOR WEATHER SEAL KIT. 11-3/8” 7-3/4” RIGHT END OF HEATER FLOOR Page 6 FIGURE 2 [48” - 5M BTU] - - - [72” - 9M BTU] DRIP LEG MANUAL SHUT OFF VALVE WITH 1/8” NPT PLUGGED TAPPING 2” FROM END OF CABINET FLOOR BASEBOARD CABINET 1/4” [48” - 5M BTU] - - - [72” - 9M BTU] DRIP LEG MANUAL SHUT OFF VALVE WITH 1/8” NPT PLUGGED TAPPING 2” FROM END OF CABINET FLOOR BASEBOARD CABINET 1/4” INSTALLATION - Cont’d. STEP 2. ROUGH IN GAS SUPPLY – (See Figure 3) a) Select the bottom, rear or right side to bring the factory supplied flexible gas line assembly out of the heater. b) The valve must be connected only by means of a pipe union of the ground joint type. Mr. Installer, hold gas valve when connecting gas supply line. c) Install at least a 3/8” gas line. Contact local gas supplier if any questions. d) Install a drip leg in gas supply line immediately upstream from the gas connection to heater, (see local codes), and provide a 1/8” N.P.T. plugged tapping, accessible for test gauge connection and a individual manual shut off valve accessible within room where heater is installed. The heater and its individual shut off valve must be disconnected from the gas supply piping system during any pressure testing of that system at test pressures in excess of . psig (3.5Pa). The heater must be isolated from the gas supply piping system by closing its individual manual shut off valve during any pressure testing of the gas supply piping system at test pressures equal to or less than . psig (3.5Pa). e) Test all connections for leaks using a soapy solution. NEVER USE AN OPEN FLAME TO TEST FOR LEAKS. f) The maximum inlet gas supply pressure for natural and L.P./Propane gas is . p.s.i. or 14” w.c. The minimum inlet as supply pressure for the purpose of adjustment is 4.5” w.c. for natural gas and 11.0” w.c. for L.P./Propane gas. FLEX LINE BALL VALVE MUST BE ABOVE FLOOR GAS SUPPLY 1/2” BLACK IRON PIPE FIGURE 3 Exhaust Tube FIGURE 4: COMPONENTS OF THE Indoor Intake Gasket DIRECT VENT GAS BASEBOARD Weather HEATER Air Intake Tube Screws Seal Flex Line Ball Valve Gas Baseboard Heater Screws STEP 3. PREPARING TO INSTALL THE BASEBOARD HEATER a) Open the carton and carefully remove the Direct Vent Baseboard Heater. b) Remove the cover of the baseboard heater’s cabinet by removing the screws at the bottom front of the cover. (See Figure 4.) c) Make sure that all of the components illustrated have been included. YOU SHOULD HAVE: • 1 – Baseboard Heater • 1 – Exhaust Tube • 1 – Air Intake Tube • 1 – 4” [10 cm] Stainless steel flexible connector with a manual shut-off valve • 1 – Template to locate venting and mounting positions (in package with manual) • 1 – Vent Sealing Gasket • 1 – Manual • 1 – Weather Seal • 1 - Wall thermostat w/wire & staples 48” - BBT53 & BBT54 Cabinet Cover 72” - BBT103 & BBT104 FIGURE 4 Page 7 THAN THE WALL THICKNESS (Do not cut to less than 5-1/2”) CUT THE EXHAUST TUBE FROM THE UNTHREADED END, USE THE CUT-OFF Measure Wall Thickness THAN THE WALL THICKNESS (Do not cut to less than 5-1/2”) CUT THE EXHAUST TUBE FROM THE UNTHREADED END, USE THE CUT-OFF Measure Wall Thickness CUT THE AIR INTAKE 1-1/2” LONGER THREADED END SECTION FROM THE AIR INTAKE TUBE AS A GUIDE (Do not cut to less than 7-1/2”) BASEBOARD HEATER 1-1/2” 1” EXHAUST TUBE AIR INTAKE TUBE EXTERIOR WALL FIGURE 5 FIGURE 6 HEATER MUST BE LEVEL USE THE MOUNTING HOLES PROVIDED IN THE CASING BACK TO MOUNT BASEBOARD TO WALL. AT LEAST ONE MOUNTING HOLE MUST ALIGN WITH A WALL STUD. BASEBOARD HEATER WEATHER SEAL FIGURE 7 FIGURE 8 Black wire to L2 on Electric Power Supply control module Black wire to L1 on control module White Wire (Electric Connection) Wire Nuts Green Wire (Ground Wire) Black Wire (Electric Connection) Junction Box Cover FIGURE 9 Page 8 INSTALLATION - Cont’d. STEP 4. INSTALLING THE BASEBOARD HEATER a) Use only factory supplied parts. Do not modify in any way. b) Using a measuring tape, measure the thickness of the wall. See Figure 5. c) Using a tube cutter, cut the air intake pipe 1.5” [3.8 cm] longer than the wall thickness (no less than 5-1/2”). Measuring from the threaded end, cut the vent exhaust pipe 3.0” [7.62 cm] longer than the wall thickness (no less than 7.5” {19.05 cm}). After cutting, check the inside of both pipes for burrs. Both pipes must be smooth and clean without any reduction to the inside diameter. NOTE: Correct pipe length is critical to proper operation. d) Attach ...

Эта инструкция также подходит к моделям:
Газовые нагреватели - BBT54 (638 kb)
Газовые нагреватели - BBT104 (638 kb)
Газовые нагреватели - BBT53 (638 kb)

Напишите ваш отзыв об устройстве



Текст отзыва
Ваше имя:
Введите две цифры:
capcha





Категории