Войти:
Оценок - 4, средний балл: 3.8 ( )

Инструкция по эксплуатации Enerco, модель ERXL-125

Производитель: Enerco
Размер: 1.11 mb
Название файла:
Язык инструкции:en
Перейти к скачиванию



Фрагмент инструкции


Venting: The venting must be installed in accordance with NFPA-54 / ANSI Z223.1 – latest revision, National Fuel Gas Code. Partial information with regard to this code is provided in (Section 5) of this installation manual with regard to size and configurations for venting arrangements. • Any portion of flue pipe passing through a combustible wall must be dual insulated or have an approved thimble. Refer to ANSI-Z223.1 – latest revision. Hazardous Locations: Where there is the possibility of exposure to combustible airborne material or vapor, consult the local Fire Marshal, the fire insurance carrier or other authorities for approval of the proposed installation. Critical Considerations Ener-Radiant ERXL is a suspended heater. Therefore, its stability, flexibility, and safety are very important. Before starting installation, be sure the system can meet the following requirements. • Maintain specified clearances to combustibles, and safe distance from the heat- sensitive material, equipment and work stations. • Provide a suspension with vertical length of chain or swinging rod which has at least 2 inches of horizontal travel for each burner in a straight run. Be sure the suspension system is sufficiently flexible to accommodate thermal expansion which occurs as the system heats up (see Figure 5 on page 15). • Provide access to burners for servicing, preferable on both sides, above and behind the burner for removal. • Provide a minimum of 18 inches of clearance between burners and building walls. (Always observe minimum clearances to combustibles.) • Be sure the heater has a downward pitch of one-half inch per 20 feet away from the burner. • Provide signs in storage areas to specify maximum stacking height to maintain required clearances to combustibles. • Plan location supports (see Figure ?). Locate a support near all elbows. Installation Procedure Take maximum advantage of the building upper structure, beams, joists, purlins, etc., from which to suspend the heater. There is no unique sequence for installation of the tubing. On-site observation will usually reveal a logical sequence. Begin the installation at the most critical dimension. This could save time. Watch for swinging doors, overhead cranes, car lifts, etc. Reflectors and tubing can be installed as you move along. Carefully adjust system pitch at each position to level the heater. Pitch down one-half inch in 20 feet (away from burner). Don’t Pressure test the gas line using high pressure (greater than . PSIG) without closing the high-pressure shutoff cocks. Failure to do so will result in damage to the burners. DO Familiarize yourself with local and national codes. Develop a planned procedure which will conserve material and labor on the job. Check to see that all material and equipment is on the job before starting installation. Allow for thermal expansion of the hot tube. Install the gas connector only as shown in instructions (see Figure 17). Have slip joints where required between reflectors to keep them from buckling or coming apart. Provide 1 sq. inch of free air opening to each 1,000 BTU/hr. of heater input (but not less than 100 sq. inches) in enclosed spaces. One opening should be within 12 inches of the top and one within 12 inches of the bottom of the enclosure. ACCESSORY PARTS LIST Stock Number Description 10371....................................Thermostat 24 volt 10392....................................Thermostat 120 volt 17370....................................Chain Kit 03445...................................Turbulator 10’ Section 03447...................................Turbulator 5’ Section 16401....................................24” Stainless Steel Flexible Gas Connector 18677A.................................Installation Manual F106414................................180° U-Tube Accessory Kit F106415................................90° Elbow Accessory Kit 19021....................................Vent Adaptor 06430...................................Vent Cap F111751 Installation kit for 20’ tube heater F111752 Installation kit for 30’ tube heater F111753 Installation kit for 40’ tube heater F111754 Installation kit for 50’ tube heater F111755 Installation kit for 60’ tube heater Installation kit includes 24-volt thermostat, vent cap, 24” stainless steel flexible gas connector, gas shutoff valve, and chair kits required to hang heater. Clearances To Combustibles TABLE 1: Minimum Clearances to Combustibles (Use Figure 1 on page 10 as a Guide) Reflector Type Position ERXL-60 ERXL-80 ERXL-100 ERXL-125 ERXL-150 ERXL-175 Standard Reflector A 6” 6” 6” 6” 6” 8” (Horizontal) B 30” 36” 36” 36” 36” 36” C 55” 55” 74” 87” 87” 87” D 30” 36” 36” 36” 36” 36” 45° Reflector Tilt A 12” 18” 18” 18” 18” 18” B 30” 36” 36” 36” 36” 36” C...

Эта инструкция также подходит к моделям:
Газовые нагреватели - ERXL-100 (1.11 mb)
Газовые нагреватели - ERXL-100S (1.11 mb)
Газовые нагреватели - ERXL-125S (1.11 mb)
Газовые нагреватели - ERXL-150 (1.11 mb)

Напишите ваш отзыв об устройстве



Текст отзыва
Ваше имя:
Введите две цифры:
capcha





Категории