|
Фрагмент инструкции
This will help insure that your installation is performed in an efficient and professional manner. The proper installation of the vehicular slide gate operator is an extremely important and integral part of the overall access control system. Check all local building ordinances and building codes prior to installing this operator. Be sure your installation is in compliance with local codes. 1.1 Specifications Class of Operation: Class III, IV Type of Gate: Vehicular Slide Gates Only Horsepower: 9210/9220: 1 HP; 9230: 3 HP Voltage / Phase: 9210/9220: 115, 208, 230 VAC 1O / 208, 230 VAC 3O 9230: 208, 230 VAC 3O Current: 9210/9220: 1O: 15 A @ 115V, 7.5 A @ 208V, 7.4 A @ 230V 9210/9220: 3O: 3.4 A @ 208V, 3.3 A @ 230V 9230 3O: 12.4 A @ 208/230V Max Gate Wt.1 9210: 3000 Lbs; 9220: 2000 Lbs; 9230: 5000 Lbs. Max Gate Length: 100 Feet Cycles / Hr: 60/Hr Speed: 9210: Approx 1 Ft./Sec. 9220/9230: Adjustable . - 2 Ft./Sec. Entrapment Protection: Primary – Inherent (Type A) Secondary – Provision for connection of a non-contact sensor (Type B1) and/or a contact sensor (Type B2). Secondary entrapment protection devices are not supplied with the operator and must be ordered separately. Note 1: Assumes gate is in good working condition installed on a level surface. 35.2516216 1.2 Mounting Options The 9210, 9220 and 9230 vehicular gate operators are designed to be mounted on the optional mounting stand (p/n 9200-135) or directly to a concrete pad. The mounting stand option is recommended if the gate length exceeds 30 feet since this mounting method will allow a “chain rest” to be mounted on the gate. Pad mounting is typically used with gates that are less than 30 feet in length. Requires use of the pad mounting plate that is included with the operator. Pedestal mounting is typically used with gates that are greater than 30 feet in length since this method allows a chain rest to be installed on the gate. Requires use of the pad mounting plate that is included with the operator. Requires use of the OPTIONAL operator mounting stand. 1.3 Chain Guide Adjustment After determining which mounting method is to be used (pad or mounting stand), adjust the chain guides according to the mounting method being used. OPEN To gain access to the inside of the operator, remove three hex-head nuts from the left side ofthe control panel housing. Pull the housing out and away. For pad mounted operators, remove the UPPERhole knockouts from each side of the operator. Adjust the chain guides as shown. Chain will be routed OVER the chain guides andUNDER the drive sprocket. For operators mounted on the mounting stand, DO NOT remove any hole knockouts. Adjust the chain guides as shown. Chain will be routed UNDER the chain guidesand OVER the drive sprocket. 1.4 Pad Mount Installation 1. Construct a form for the mounting pad according to the specifications shown below. Be sure to level the top edge of the form and that the top of the form is a minimum of four (4) inches above ground level. We suggest that you contact the local building department to determine the required depth of the pad since soil conditions and code requirements vary from city to city. 2. Set conduits, reinforcing bars and/or wire mesh if required. The number of conduits is determined by the application requirements. We suggest using a minimum of four (4) conduits. 1-High voltage power lines; 2-Low voltage control lines; 3-Loop lead-in wires (open loop); 4-Loop lead-in wires (reverse loops). Conduits can be set in the areas indicated in the illustration. See SECTION 2. Set additional conduits as required for your application. NOTE: If conduits are not set in the pad, they can be routed to a J box where connections to the operator can be made after it is installed. There are four (4) .- inch knockouts in the operator for this purpose. 3. Mix the concrete according to the manufacturers instructions. Pour the mixture into the form and tamp. Level and finish the surface after pouring is complete. Do not set anchor 42342817.511.2512.016.016.7520.56.7510.7511.75Pad depth determined by soilconditions and local building codes. Minimum depth is 18 inches. Minimum 4 inchesabove ground level. GATE1GATEGATEGATE bolts in the concrete. Sleeve anchors should be used to secure the operator to the pad. This allows greater flexibility in positioning the operator on the pad. 4. Allow the pad to cure for 48 hours before removing the forms or mounting the operator. 5. Once the pad has cured, place the operator / mounting plate on the pad in the proper position; 4-inches from the front and sides of the pad and 1-inch from the rear of the pad. The operator mounting plate must be parallel to the gate. CAUTION: the operator is heavy. Two persons are required to lift the operator onto the mounting pad. 6. Once the operator is in the proper position on the pad, secure the operator mounting plate directly to the pad using 3/8 or 1/2 x 3 sleeve anchors. Be sure that the operator mounting plate is parallel to the g...
Эта инструкция также подходит к моделям:Двери и окна - 9210 (586.28 kb)
Двери и окна - 9230 (586.28 kb)