|
Фрагмент инструкции
REQ. FIG. PART NO. DESCRIPTION OF PART NO. REQ. 31 49-15-0265 Side Handle Assembly (1) 32 48-66-0070 1/4 Chuck (1) 33 48-66-3200 Chuck Key (1) 34 48-66-4080 Chuck Key Holder (1) 35 22-84-0845 Fan (1) 36 45-30-0030 Slug (2) 37 45-30-0035 Slug (1) 38 23-52-1610 Brush Spring (2) 39 22-18-1310 Brush Assembly (2) 40 06-75-2850 3/8-16 x 5-1/2 Hex Cap screw (1) 41 42-68-0800 Side Handle Clamp (1) 42 43-62-0845 Side Handle (1) 43 06-54-0325 3/8-16 Square Nut (1) LUBRICATION (Type "Y" Grease, No. 49-08-5270) • Place 5 gm. (.02 oz.) of grease on top of the inserted intermediate ball bearing (1) and on the intermediate pinion (22). • After inserting all gearing, place 13 gm. (.46 oz.) of grease at the armature pinion location in the gearcase (15) and fill to the top of the intermediate gear (19). Grease must contact at least 25% of the intermediate gear teeth. Before assembly, lightly coat all press fit areas with lightweight spindle oil. FIG. 4,20 5,6 NOTES: Support the output ball bearing inside the gearcase before pressing off the spindle gear. Needle bearings to be pressed flush to .010 under flush from the end which has the vendors identification. MILWAUKEE ELECTRIC TOOL CORPORATION 13135 W. LISBON RD., BROOKFIELD, WI 53005 Drwg. 3...
Эта инструкция также подходит к моделям:Дрели и шуропопверты - 54-06-2800 (95.66 kb)
Дрели и шуропопверты - 54-06-2800 (95.66 kb)
Дрели и шуропопверты - 54-06-2800 (95.66 kb)
Дрели и шуропопверты - 58-01-1805 (95.66 kb)